My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150009 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150009 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:23:05 AM
Creation date
10/5/2006 11:57:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150009
Contractor Name
Boulder & Left Hand Irrigation Company, The
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />STATE CW COLORADO <br /> <br />o <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866.3441 <br />FAX: (303) 866,4474 <br /> <br />Roy Romer <br />Covernor <br /> <br />March 12, 1998 <br /> <br />'ames S. Lochhead <br />Executive Director, DNR <br /> <br />Oades C.lile, P.E. <br />Direcfor. eweB <br /> <br />Mr. Henry Laber, President <br />Boulder & Left Hand Irrigation Co. <br />8003 North 95"' Street <br />Longmont, CO 80501 <br /> <br />RE: Rehabilitation of Twin Lakes Outlet <br />Loan Approval <br /> <br />Dear Mr, Laber, <br /> <br />Concerning your application for a Small Project Loan from the Construction Fund, I am pleased to <br />inform you the Colorado Water Conservation Board (CWCB) has approved your request for a loan <br />in a maximum amount of$50,000, It is our understanding the loan funds will be used to rehabilitate <br />the Twin Lakes inlet and outlet structures, and to rehabilitate other drop structures on the ditch. The <br />Board also approved a $5000 grant to complete the feasibility study, <br /> <br />The CWCB approved a loan term of 15 years at an interest rate 00.75%, I have attached a copy of <br />the updated Board memo concerning the Boulder and Left Hand Irrigation Company, Please refer <br />to page 3 of that memo and to the section "Action Taken by ,the CWCB, March 10,1998", <br /> <br />When the Board approves a Small Project Loan there remain several conditions: <br /> <br />a, A Feasibility Studv must be completed, The CWCB has set aside grant funds of up to <br />$5000 to pay for the study, The study is usually completed by your engineer, III <br />accordance with the CWCB Guidelines, I will call you to discuss this requirement. <br /> <br />b, An approved contract must be in place before funds can be advanced, Jan Illian will <br />contact you concerning our contracting procedure, It usually takes about 2 months to <br />complete the contract. <br /> <br />c, You must adhere to the CWCB Design and Construction Administration Procedures, <br />Mike Serlet will contact you regarding the CWCB requirements concerning design and <br />bidding of the construction project. Mike will make construction inspections, which will <br />be the basis of the monthly pay estimates for disbursements of your loan funds, <br />
The URL can be used to link to this page
Your browser does not support the video tag.