My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150009 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150009 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:23:05 AM
Creation date
10/5/2006 11:57:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150009
Contractor Name
Boulder & Left Hand Irrigation Company, The
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />Ag""" It ll3b <br />March 10,11998 <br />Page 2 i <br /> <br />. <br /> <br />. <br /> <br />\ ' <br /> <br />(Updated March 12. 1998) <br /> <br />DISCUSS ON <br /> <br />The pr' purpose of the project loan is to rehabilitate the inlet and outlet structures for the <br />Twin Lak s Dam, Recent engineering inspections by the State Engineers office, and by RMC, <br />indicate t the outlet conduit has rusted through, exposing the surrounding soil. <br /> <br />The seco 'dary purpose of the loan is the rehabilitation of ditch structures (primarily drop <br />structures! that are in very poor condition. <br />, <br />i <br /> <br />The Com any needs to reconstruct the Twin Lakes: outlet and inlet structures in 1998, Recent <br />engineeri inspections show these structures could fail at any time, Twin Lakes Reservoir has a <br />total capa ity of 218 acre-feet and this storage would: be lost if the State Engineer imposes a gage <br />o restricti n, Delaying the project until 1999 would result in an undue hardship on the borrower. <br />I <br />The Boul, er and Left Hand Irrigation Company provides water for irrigation, A loan to the <br />Company ishould thus be at the "Agricultural" rate (4% for 30 years, or 3.75% for 20 years, or <br />3,5% for 0 years), as set by the CWCB on November 24, 1997, <br /> <br />The Com any's stockholders have already approved 'a resolution to proceed with this loan, They <br />have also approved an assessment increase of $40 per share to make the loan payment to the <br />CWCB, copy of the resolution is attached, <br />! <br /> <br />The Co <br />interest . <br /> <br /> <br />RAL <br /> <br />i, fr ' <br />any receives assessments om Its <br />this stream of revenues, <br /> <br />stoc\<holders, The CWCB will take a security <br /> <br />The Com any can provide one payment in a certificate of deposit account, to be held by the State <br />Treasure <br /> <br />STAFF I COMMENDATION <br /> <br />The staff recommends: <br /> <br />1. That he Board finds that delay in the rehabil.tation of the inlet and outlet structures on <br />the 'n Lakes Reservoir and drop structure$ on the ditch would cause undue hardship <br />for t e water users, qualifying the Boulder ~nd Left Hand Irrigation Company for a <br />loan ,rom the Small Project Loan Account, ~d <br />I <br />2, That ~ Construction Fund Authorization in an amount of $50,000, not to exceed 75% of <br />actu ' project costs be approved for the Boulder and Left Hand Irrigation Company to <br />reha ilitate the inlet and outlet structures ,on the Twin Lakes Reservoir and drop <br />struc ures on the ditch, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.