My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150009 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150009 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:23:05 AM
Creation date
10/5/2006 11:57:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150009
Contractor Name
Boulder & Left Hand Irrigation Company, The
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />'/) >t.rl-f"~vv <br /> <br />STATE CifCOLOMDO <br /> <br />8 <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1 J 1 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: ()O)) 866')441 <br />FAX: ()O))866,4474 <br /> <br />Bill Owens <br />Governor <br /> <br />November 29, 1999 <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />Peter H. Evans. <br />Director, ewes <br /> <br />Mr, Henry Laber, President <br />Boulder & Left Hand Irrigation Co, <br />8003 North 95th Street <br />Longmont, CO 80501 <br /> <br />RE: Rehabilitation of Twin Lakes Dam <br />Approval of Loan Increase <br /> <br />Dear Mr, Laber, <br /> <br />Concerning your application for an increase in your' eXlstmg Small Project Loan from the <br />Construction Food, I am pleased to infonn you the Colorado Water Conservation Board (CWCB) <br />has approved your request. The new loan amooot is $100,000, It is our ooderstanding the loan <br />funds will be used to rehabilitate the Twin Lakes outlet structure and incorporate a new spillway, <br /> <br />The CWCB approved a loan tenn of20 years at an interest rate of3,75%, I have attached a copy of <br />the updated Board memo concerning the Boulder and Left Hand Irrigation Company, Please refer <br />to page 3 of that memo and to the section "Action taken by the CWCB Nov, 22, 1999," <br /> <br />When the Board approves a Small Project Loan there remain several conditions: <br /> <br />a) A Feasibility Study must be completed, We have reviewed the Feasibility of the Repair of the <br />Outlet Works and Construction of a new Spillway at Twin Lakes, and find that the report fully <br />meets the requirements of the CWCB Construction Food Guidelines for feasibility studies, <br />Based on this we have approved final payment of the $5,000 CWCB grant to help fund the <br />study, <br /> <br />b) An approved contract must be in place before funds can be advanced, Jan IIlian will contact <br />you concerning our contracting procedure, It usually' takes about 2 months to complete the <br />contract. <br /> <br />c)' You must adhere to theCWCB Design and Construction Administration Procedures, Tim <br />Feehan will contact you regarding the CWCB requirements concerning design and bidding of <br />the construction project. Tim will make construction inspections, which will be the basis of the <br />monthly pay estimates for disbursement of your loan funds, <br />
The URL can be used to link to this page
Your browser does not support the video tag.