Laserfiche WebLink
<br /> <br />IL <br /> <br />FEASIBILITY STUDY <br /> <br />1- <br /> <br />FOR <br /> <br />L <br /> <br />1_- <br /> <br />REHABILITATION OF FOOTHILLS RESERVOIR DAM <br /> <br />L <br /> <br />OWNED BY <br /> <br />L <br /> <br />L <br /> <br />THE HIGHLAND DITCH COMPANY, INC. <br />4309 State Highway 66 <br />Longmont, CO 80504 <br /> <br />L <br /> <br />L <br /> <br />PREPARED BY <br /> <br />I~~ <br />I~ <br />I~ <br />I- <br />I <br />I ~ <br />I- <br />I - <br />I~ <br /> <br />SMITH GEOTECHNICAL <br />1225 RED CEDAR CIRCLE, SUITE H <br />FORT COLLINS, COLORADO 80524 <br /> <br />Sponsored by the <br /> <br />The Highland Ditch Company, Inc. <br /> <br />in conjunction with the <br /> <br />Colorado Water Conservation Board <br /> <br />January 15, 1998 <br />