Laserfiche WebLink
<br />I. DRAIN BLANKET <br /> 1. Mobilization, Insurance, Misc. 1 LS $29,000.00 $29,000.00 <br /> 2. Stripping, Clearing, Grubbing 4 ACRES $1,500.00 $6,000.00 <br /> 3. Excavation 22000 CY $2.00 $44,000.00 <br /> 4. Sand Filter 4270 CY $20.00 $85,400.00 <br /> 5. Gravel Drain 4270 CY $20.00 $85,400.00 <br /> 6. Geotextile Membrane 152000 SF $0.40 $60,800.00 <br /> 7. Compacted Clay Cover 22000 CY $3.50 $77,000.00 <br /> 8. Toe Drain 1600 LF $20.00 $32,000.00 <br /> 9. Toe Drain Measuring Weir 2 LS $1,500.00 $3,000.00 <br /> 10. Riprap at Weir Outflow 50 CY $25.00 $1,250.00 <br /> 11. Riprap Bedding 25 CY $25.00 $625.00 <br /> 12. Topsoil and Seeding 4 ACRES $2,500.00 $10,000.00 <br /> Subtotal $434,475.00 <br />II. SPILLWAY <br /> 1. Stripping & Clearing 5 Acres $1,000.00 $5,000.00 <br /> 2. Concrete Control Wail 25 CY $300.00 $7,500.00 <br /> 3. Earth Excavation 23000 CY $2.50 $57,500.00 <br /> 4. Spoil 22000 CY $1.50 $33,000.00 <br /> 5. Earth Fiil 1000 CY $2.50 $2,500.00 <br /> 6. Riprap 2000 CY $28.00 $56,000.00 <br /> 7. Riprap Bedding 650 CY $25.00 $16,250.00 <br /> 8. Access Road 1 LS $2,500.00 $2,500.00 <br /> 9. Topsoil & Seeding 5 Acres $1,500.00 $7,500.00 <br /> Subtotal $187,750.00 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ALTERNATIVE I <br />Blanket Drain <br /> <br />ITEM DESCRIPTION <br /> <br />TABLE 1 <br />FOOTHILLS RESERVOIR <br /> <br />01/14/98 <br /> <br />QUANTITY UNITS <br /> <br />UNIT <br />PRICE <br /> <br />TOTAL <br />AMOUNT <br /> <br />Construction Cost <br />Engineering, Legal & Contingencies <br />TOTAL ESTIMATED PROJECT COST <br /> <br />$622,225.00 <br />$155.556.25 <br />$777,781.25 <br />