Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />COST ESTIMATE <br /> <br />A summary of the cost estimates for the three alternatives are shown in the following table. <br /> <br />SUMMARY OF ESTIMATED PROJECT COSTS <br />ALTERNATIVEili DESIGN I ESTIMATED CosT I <br /> <br />1 Blanket Drain $ 777,781 <br />2 PVC Liner $ 1,390,766 <br />3 Clay Liner $ 1,348,425 <br /> <br />A more complete breakdown of the costs are shown in the Table 1, 2, and 3 at the end of this <br />report. <br /> <br />THE SELECTED PROJECT <br /> <br />Based on the study conducted at this time, the Company selected Alternative No.2 above with <br />a total estimated project cost of $ 1,390,766. The scope of work required for this alternative is <br />outlined in the section entitled, ALTERNATIVES EVALUATED. A breakdown of the <br />construction costs, engineering fees, legal fees, and contingencies are shown in the following <br />table. <br /> <br />I ... <br /> <br />ALTERNATIVE 3 - ESTIMATED COSTS <br />....1lteM{...... .... .........\ifloP1N10NOEiCOST{ ..1 <br /> <br />Construction Cost $ 1,069,820.00 <br />Legal Fees & Contingencies $ 149,775.00 <br />Engineering Fees $ 171,171.00 <br /> <br />TOTAL <br /> <br />$ 1,390,766.00 <br /> <br />Foothills Dam- 96.014 <br /> <br />Page 6 <br />