My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00480
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 9:37:08 AM
Creation date
10/5/2006 11:57:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150015
Contractor Name
Highland Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />COST ESTIMATE <br /> <br />A summary of the cost estimates for the three alternatives are shown in the following table. <br /> <br />SUMMARY OF ESTIMATED PROJECT COSTS <br />ALTERNATIVEili DESIGN I ESTIMATED CosT I <br /> <br />1 Blanket Drain $ 777,781 <br />2 PVC Liner $ 1,390,766 <br />3 Clay Liner $ 1,348,425 <br /> <br />A more complete breakdown of the costs are shown in the Table 1, 2, and 3 at the end of this <br />report. <br /> <br />THE SELECTED PROJECT <br /> <br />Based on the study conducted at this time, the Company selected Alternative No.2 above with <br />a total estimated project cost of $ 1,390,766. The scope of work required for this alternative is <br />outlined in the section entitled, ALTERNATIVES EVALUATED. A breakdown of the <br />construction costs, engineering fees, legal fees, and contingencies are shown in the following <br />table. <br /> <br />I ... <br /> <br />ALTERNATIVE 3 - ESTIMATED COSTS <br />....1lteM{...... .... .........\ifloP1N10NOEiCOST{ ..1 <br /> <br />Construction Cost $ 1,069,820.00 <br />Legal Fees & Contingencies $ 149,775.00 <br />Engineering Fees $ 171,171.00 <br /> <br />TOTAL <br /> <br />$ 1,390,766.00 <br /> <br />Foothills Dam- 96.014 <br /> <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.