My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00479
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The WMRS supplies potable water to rural customers on Wrights Mesa and to the towns of <br />Norwood and Redvale. The facilities associated with the WMRS consist primarily of a 10 million <br />gallon raw water reservoir, a 290 gallon per minute (gpm) treatment plant, 700,000 gallons of <br />treated water storage in enclosed tanks, the pipelines connecting these facilities, and the <br />treated water distribution system, Raw water is obtained from Gurley Reservoir, Gardner <br />Spring, and wells, Approximately 500 taps are served in the system which have a total average <br />annual demand of about 180 af, <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.