My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00476
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:45 AM
Creation date
10/5/2006 11:56:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153594
Contractor Name
Handy Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />j <br />I <br />,I <br />- <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />t <br /> <br />Item <br /> <br />5) <br />CY <br /> <br />CY <br /> <br />Ton <br /> <br />10) <br /> <br />LS <br /> <br />CHAPTER VI <br />ESTIMATED COSTS <br /> <br />The estimated costs for the repairs at Welch Reservoir are shown below. <br /> <br />DescriDtion Unit Ouantity <br /> <br />1) <br /> <br />2) <br /> <br />Mobilization/Demobilization LS 1 <br /> <br />Demolition of Existing <br />Outl et Structure LS 1 <br /> <br />3) <br /> <br />Excavation and Removal of <br />Existing Outlet Pipe CY 11961 <br /> <br />Installation of New Ductile <br />Iron Outlet Pipe (Class 52, LS 1 <br />250 feet) <br /> <br />4) <br /> <br />Placing Lean Concrete Haunch <br />Backfi 11 <br />122.2 $120.00 $14.664 <br /> <br />6) <br /> <br />Reconstruction of Dam <br />Embankment including Riprap <br />Slope Protection and Plunge <br />Basin <br />11961 $ 3.75 $44.853 <br /> <br />7-) <br /> <br />Placing and Compacting <br />Granul ar Fil ter <br />21 $ 40.00 <br /> <br />$ 840 <br /> <br />8) <br /> <br />Placing and Compacting <br />Granular Drain <br /> <br />21 <br /> <br />Ton <br /> <br />9) <br /> <br />Forming and Placing Structural <br />Concrete for Outlet Structure <br />Control Beam, Control Platform, <br />and Downstream Headwall CY <br /> <br />72.2 <br /> <br />Assembling and Installing <br />12" Gate and Accessories, <br />30" Gate and Accessories, <br />Trash Rack <br />1 $15.000 $15.000 <br /> <br />TOTAL ESTIMATE <br /> <br />$ <br /> <br />157.721. 00 <br /> <br />25 <br /> <br />Unit <br />Price <br /> <br />$10.000 <br /> <br />$ 5.000 <br /> <br />$ 2.30 <br /> <br />$17.312 <br /> <br />$ 42.00 <br /> <br />$300.00 <br /> <br />Extension <br /> <br />$10.000 <br /> <br />$ 5.000 <br /> <br />$27.510 <br /> <br />$17.312 <br /> <br />$ 882 <br /> <br />$21. 660 <br />
The URL can be used to link to this page
Your browser does not support the video tag.