Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />HANDY DITCH COMPANY . . . <br /> <br />Berthoud, Colorado <br /> <br />RESOLUTION <br /> <br />A RESOLUTION REQUESTING STATE CONSTRUCTION FUNDING THROUGH THE <br />COLORADO WATER CONSERVATION BOARD FOR REPAIRS TO HANDY RESERVOIR <br />DAM (AKA WELCH DAM) OUTLET WORKS. <br /> <br />Whereas, the State Engineer's Office has required permanent <br />repairs or modification of the No.1 Outlet Works because of <br />leakage in the outlet piping; and <br /> <br />Whereas, the Handy Ditch Company intends to replace the <br />No. 1 Outlet Works so that the dam is stable and water storage <br />is not restricted; and <br /> <br />Whereas, the Handy Ditch Company desires to consolidate an <br />existing loan with the Bank of Co-ops into this funding request; <br /> <br />NOW, THEREFORE, be it resolved by the Board of Directors <br />of the Handy Ditch Company: <br /> <br />1. That the total estimated cost for repairing the No. 1 <br />Outlet Works, including the Feasibility Report, Engineering Costs, <br />and construction costs is $190,000. <br /> <br />2. That the outstanding balance of the existing loan with <br />Bank of Co-ops is approximately $120,000. <br /> <br />3. That the Handy Ditch Company is applying to the Colorado <br />Water Conservation Board for $310,000 in State construction loan <br />monies to fund this project and repay the Bank of Co-ops loan. <br /> <br />4. That the Handy Ditch Company proposes to repay State <br />construction funds over a period of 40 years. <br /> <br />Introduced, Read and Adopted by the Board of Directors of <br />the Handy Reservoir Company this 6th day of October, 1990. <br /> <br />~t.~A.. /r:( ~{2rf~'-/'~ <br /> <br />/ John M. Waggener' <br />I President <br /> <br /> <br /> <br />Louis F. Bein <br />Secretary-Treasurer <br />