Laserfiche WebLink
<br />:i <br /> <br />O~RR~"'~R Sh_II --"---e to the foil w'lng' <br />wv ,vvvC l'UI.o.U1ICI O. <br /> <br />a, The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT, <br />b, The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance with <br />the terms of this contract when available prior to bidding. Any modifications to the <br />plans and specifications must be approved in writing by the CWCB staff. <br />c, For plans and specifications for all jurisdictional dams and reservoirs, as defined by 9 <br />37-87-105 C,R.S" the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />d. CWCB staff must be present at bidding and must approve the award of the <br />construction contract. <br />e. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />f. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the contractor's proposal, construction contract, performance bond, <br />payment bond, notice of award, notice to proceed, sample change order, and sample <br />field order, as well as the advertisement for bid and bid bond at bidding, After the <br />CWCB staff verifies that these documents comply with the terms of this contract, the <br />BORROWER may issue the notice to proceed to the Construction Firms, <br />g, The BORROWER shall conduct a pre-construction conference at which time the CWCB <br />staff shall have the opportunity to review and approve the construction schedule, <br />h, If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by the <br />CWCB staff. <br /> <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications. <br /> <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by S 37-87,105, C.R,S" the <br />BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing, <br /> <br />k, Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br /> <br />I. The BORROWER shall pay all of the expenses related to the Project when such bills are <br />due. <br /> <br />2, Eligible Expenses, Listed below are the PROJECT expenses for which the BORROWER <br />is eligible for reimbursement: <br /> <br />a. Preparing final designs and specifications for the PROJECT, <br /> <br />b. Preparing bid and construction contract documents. <br />c. Preparing environmental assessment or environmental impact, statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />Julesburg Irrigation District <br /> <br />Page 6 of 12 <br /> <br />Loan Contract <br />