My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150060A Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150060A Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 3:19:36 PM
Creation date
10/5/2006 11:56:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150060A
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Sedgwick
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />SPECIAL'ETING, MARCH 1, 2001 <br /> <br />. <br /> <br />A special meeting of the Board of Directors and Officers of the Julesburg Irrigation District was held <br />Thursday, March 1,2001 at 2:00 p.m, in the Community Room of the Courthouse, <br />Those attending were the following Directors and Officers: <br />George Dracon, President Lany Frame, Superintendent <br />Robert "Bud" Kinnison, Director Pam Collins, Secretary <br />Lawrence Lechman, Director <br /> <br />The meeting was called to order by President, George Dracon, and discussion was had on the <br />proposed loan contract for the structure on the PeteresenlLodgepole confluence and the <br />amended contract with CWCB for renegotiation of the interest and loan life of the Outlet Loan <br />Contract, Lawrence made a motion to accept the Resolution in regards to the <br />Petersen/Lodgepole structure, with the Contract No. C 150060 for a principal sum of <br />$100,000,00, at an interest rate of3,5% for 30 years. Bud made the second and it was <br />approved unanimously, <br />Bud made a motion to accept an amendment to Contract No, CI53604 (Outlet Loan), <br />which in the future will be referred to as Contract No. CI 53604-Amendment No, 2. This <br />amendment will change the Outlet Loan which currently is a 40 year loan at an interest rate of <br />5% with a principal sum 0[$372,950,79 TO a 30 year loan at a rate of3,5% with the same <br />principal sum. The annual paym~nt will be $20,277.83, with the first payment being due July <br />I, 200 I, Lawrence made the second and it was unanimously approved, <br />Bud made a motion to let Concrete Specialties know they can proceed with the work on <br />the Petersen/Lodgepole structure as of 3/1/0 I per JID's Board of Directors, George made a <br />second and it was unanimously approved, <br /> <br />c{~t~). <br /> <br />Sec ary <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.