Laserfiche WebLink
<br />/;~, <br /> <br />,- <br /> <br />PROJECT SUMMARY <br /> <br />SECTION 1 -BORROWER INFORMATION <br /> <br />Name: Julesburg Irrigation District <br />Address: 315 Cedar Street <br />Julesburg, CO 80737 <br /> <br />Phone Number: 970-474-3737 <br /> <br />Contact: Larry Frame, Superintendent <br /> <br />Type of Entity: duly constituted Colorado irrigation district formed pursuant to and <br />governed by Articles 41 and 43 of Title 37, C.R.S. <br /> <br />Section 2 - Project Description <br /> <br />A. Description of Project: Reconstruction of the Peterson ditch control structures on <br />Lodgepole Creek, consisting of constructing a new 12-foot drop chute spillway that <br />drops flood flows from the Peterson Ditch to the Lodgepole Creek and construction of <br />a water control structure on the Peterson Ditch at a total cost of $145,000, <br /> <br />B. Description of Feasibility Study: Feasibility report compiles by John Van Sciver, <br />CWCB, and Glen Newlon, P,E" which is incorporated herein by reference, and, based <br />upon this feasibility report, the CWCB determined the project to be technically and <br />financially feasible. <br /> <br />SECTION 3 - COLLATERAL <br /> <br />Collateral. Part of the security provided for this loan, as evidenced by the executed Deed of <br />Trust attached as Appendix 5 and incorporated herein, shall be an undivided one hundred <br />percent (100%) interest in the Julesbur9 Reservoir as more completely described in said deed of <br />trust. <br /> <br />SECTION 4 - DISBURSEMENT SCHEDULE <br /> <br />The CWCB shall disburse the full loan amount to the Borrower in the following increments: <br /> <br />1. 50% of loan amount at award of construction contract <br /> <br />2. 40% of loan amount at 50% completion of the PROJECT as determined by the CWCB staff <br />3. Remaining loan amount upon substantial completion of the PROJECT as determined by the <br />CWCB staff <br /> <br />SECTION 5 - TIME FOR PERFORMANCE <br />Project Beginning: Upon effective date of this contract <br />Project Finish: Two (2) years from the effective date of this contract <br />