Laserfiche WebLink
<br />r <br />., <br />~l TABUlATION OF BIDS TO: PLATTE CANYON WATER AND SANITATION DISTRICT APPENDIX IIAII <br />I.; FOR: CONSTRUCTION OF SEWAGE LIFT STATION AND SEWAGE DISCHARGE MAIN <br />" <br />:~ DATE OF BID OPENING: 3:30 P.M. Thursday, December 8, 1977 <br />1 ENGINEERS: REA, CASSENS AND ASSOCIATES, INC. 3375 S. Bilnnock, Englewood, Colorado <br />;j <br />:j <br /> UANTITY NELSON PIPELINES WATTS BROS. SCHMIDT- TIAGO <br />., <br /> Lum Sum 185 400.00 218 000.00 233 000.00 <br /> Sum 6 380.00 9 000.00 5 700.00 <br /> Sum 10200.00 14 000.00 12 300.00 <br /> 20.00 12.00 23.00 <br /> . 10 CY 200.00 120.00 230.00 <br /> 3.25 3.00 10.00 <br /> 160 SY 520.00 480.00 1 600.00 <br /> Lum Sum 26 390.00 18 000.00 12 300.00 <br /> TOTAL FOR SCHEDULE 229 090.00 259 600.00 265 30.00 <br /> 10.00 38.00 <br /> 450 LF 4 500.00 <br />,I 31.50 65.00 <br /> 450 LF 14 <br /> 3. 4 <br /> Ea <br /> 4. <br /> . 1 Ea <br /> 5. 5 1,420.00 1,200.00 <br /> 4 Ea 5 680 00 <br /> 6. <br /> Lum Sum 1 600.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />- '. <br /> <br />. .\, <br />