My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153344 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153344 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153344
Contractor Name
Platte Canyon Water and Sanitation District
Water District
0
County
Jefferson
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />EXHIBIT C <br /> <br />-e <br /> <br />:".1 ['/V) <br />'rf~ <br /> <br /> <br />Rea, eajjenj and Ajjocial~ii.'c;,. <br /> <br /> <br />~. <br /> <br />CotUufting GnfJineel'3 <br /> <br /><,' <br /> <br />SUITE 200 <br />3900 SOUTH FEDERAL 8LYD. <br />ENGLEWOOD. COLORADO 801 10 <br />(303) 789-4428 <br /> <br />August 2.7, 1979 <br /> <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denyer, Colorado 80203 <br /> <br />Attention: Mr. Richard Teed <br /> <br />The Platte Canyon Water and Sa~itation District has completed the <br />construction of Specifications No. 07-032 entitled, "Platte Canyon <br />Water and Sanitation District - Construction of Sewage Lift Station <br />and Discharge Main." <br /> <br />The installation of the discharge main was accomplished in accordance <br />with the original design so as to accomodate the re-channelization of <br />the South Platte RiYer. <br /> <br />Our letter of December 12, 1977 stated that the District would request <br />reimbursement after the completion of the project. Completion of the <br />project was delayed due to a lengthy deliyer:period on the lift station <br />equipment. <br /> <br />Enclosed for your reference is one copy of Pay Estimate No.4 (Final) <br />to Nelson Pipeline Constructors, Inc. <br /> <br />We would request, on behalf of the Platte Canyon Water and Sanitation <br />Distri ct. reimbursement in the amount of: <br /> <br />Schedule No. 2 - DISCHARGE MAIN <br /> <br />Payment to Contractor <br />Engineering Fee (11%) <br />Requested Reimbursement <br /> <br />$50,082.50 <br />5,509.02 <br />$55,591.52 <br /> <br />Please note that the requested reimbursement is based upon a completed <br />construction cost of $50,082.50 which is $678.75 less than the bid of <br />$~ 0, 761. 25. <br /> <br />i <br /> <br />EXHIBIT C <br /> <br />I <br /> <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.