Laserfiche WebLink
<br />. ,.,:::\ <br />-. :'" \',;; ; '"-' "\\~~ <br />..... \.' ~ \. 1_>'- ....... , <br /> <br />); ':'\\~:'~'O\) ,.~) <br />. r. ~l / <br />\ <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT B <br /> <br />\ <br /> <br />.' <br /> <br />.' .,.'. .-\ <br />.~I ,r., ' . .\:....~.{v <br />.. r <br /> <br />Agency No: 34-04-00 <br />Routing No: 6590 <br />No State Fun~ <br />Encumbered <br /> <br />'" <br />(; <br />11'.! <br />l.'t <br />" : ~:! <br />",il <br />, <br />I <br /> <br />, ," <br />J' <br /> <br />AMENDED <br />SUPPLEMENTAL AGREEMENT NO. 1 BETWEEN <br />THE UNITED STATES OF AMERICA <br />AND <br />THE STATE OF COLORADO <br />ACTING TllROUGll Till:: Dl::l'ARTNl::NT OF NATURAL Rl::SOURCES (COLORADO WATER <br />CONSERVATION BOARD), PERTAINING TO THE SOUTH PLATTE RIVER, COLORADO, <br />CHATFIELD LAKE, DOWNSTREAM CHANNEL I~~ROVE~lliNTS <br /> <br />THIS SUPPLEMENTAL AGREEMENT entered into this 29th day of January 1980, <br />and between the United States of America (hereinafter called the <br />"Covernment "), represented by the Corps of Engineers, the Contracting Officer <br />executing this agreement, and the State of Colorado, acting by and through <br />the IJepartment of Natural Resources (Colorado Water Conservation Board), <br />hereinafter called the "State," WITNESSETH THAT: <br /> <br />WHEREAS, the subject Project has been divided into three distinctive <br />"reaches" (Reach One extending from the upstream limit of the Project located <br />at the Federal acquisition line of the Chatfield Lake Project to the site of <br />a new channel control weir to be located approximately due east of the street <br />named Fairway Lane in the tOlffi of Columbine Valley; Reach Two extending from <br />that same weir to the present West Oxford Avenue Bridge Crossing; and Reach <br />Three extending from that bridge crossing to the downstream limit of the <br />project located at the present West Hampden Avenue Bridge Crossing) for the <br />purpose of locating individual measures to be implemented (see Exhibit A); <br />and <br /> <br />WHEREAS, the Government and the State entered into the basic contract for <br />Reach One on 7 Sept ember 1977; and <br /> <br />\~lEREAS, the Government and the State are desirous of amending the basic <br />contract by entering into an agreement for Reaches Two and Three of the <br />Project; <br /> <br />WHEREAS, the State, through the Colorado Water Conservation Board, hereby <br />represents that it has the authority and capability pursuant to 37-60-106, <br />Colorado Revised Statutes 1973, to furnish the non-Federal cooperation <br />required by the Federal legislation authorizing the flood control works and <br />by other applicable law; and <br /> <br />WllEREAS, pursuant to Senate Bill No. 537, enacted by the Colorado General <br />Assembly during the 1979 regular session and duly signed into law, there was <br />appropriated to the Colorado Water Conservation Board the sum of $2,500,000 <br />to carry out the provisions of this contract. The current estimated Federal <br />expediture to carry out the project is $4,056,000; and <br /> <br />EXHIBIT B <br /> <br />I <br />I <br />" . <br />