Laserfiche WebLink
<br />Form 6.,\(,.()2.\ <br /> <br /> <br />'-VI ~ <br /> <br />CONTRACT <br /> <br />$55,591.52 <br /> <br />THIS CONTRACT, made this 1st day of Februarv 1981. by and between the <br />State of Colorado for the pse and benefit of the Department of .1 Natural Resources <br />(Colorado Water conservation Board) <br />hereinafter referred to as the State, and "2 the Platte Canvon Water and Sanitation District, <br />333 SCuth Bannock Street, Enqlewood, COlorado 80110 <br />hereinafter referred to as the contractor, <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains a(!/~ fl/fayment in ~und Numbe.r 4008 , <br />G/L Account Number 560lX, Contract Encumbrance Number :2, and <br /> <br />WHEREAS, required approval, c1e8rance and coordination has been accomplished from and with appropriate <br />agencies; and <br /> <br />WHEREAS. ., pursuant to the provisions of 37-60-119, COlorado Revised <br />Statutes 1973, as amanded, the State is authorized to construct certain water <br />projects for the benefit of the people of the state of COlorado; and <br /> <br />WHEREAS, pursuant to the provisions of 37-60-122, COlorado Revised Statutes <br />1973, as arrended, the COlorado General Assembly authorized to be constructed <br />the Chatfield Project Channel IItproverrent fran such funds as nay becorre <br />available to the Colorado Water ConseJ:Vaticn Board constnK':tion fund; and <br /> <br />WHEREAS, pursuant to Senate Bill 537, enacted by the COlorado General <br />Assembly during the 1979 regular session and duly signed into law, there was <br />appropriated to the Colorado Water Conservation Board the sum of $2,500,000 <br />to provide the non-federal participation in the construction of the Olatfield <br />Project Channel IItproverrent; and <br /> <br />WHER.EAS, the State has entered into an agreement with the United States of <br />!\merica, represented by the Corps of Engineers on Septerrer 7, 1977, attached <br />hereto as Exhibit "A"; and <br /> <br />WHEREAS, the above agreerrent between the State and the lliited States of <br />America, represented by the Cbrps of Engineers, has been anended by Supplerrental <br />Agreement Number 1, dated January 29, 1980, attached hereto as Exhibit "B"; and <br /> <br />WHEREAS, pursuant to the provisions of the Supplerental Agreerrent Number 1, <br />the State agrees to perfonn without cost to the United States, in conjunction <br />with furnishing rights-of-way, all necessary rem::>va1 or alternation of existing <br />buildings or other inproverrents and all necessary a1temations to bridges <br />(except railroad), roads, streets, sewers and other utili ties; and <br /> <br />l'iIJEREAS, the construction of the Chatfield Project Channel IItprovement will <br />require the installation of a new discharge line, at a lo.ver elevation, extending <br />from an enlarged sewage lift station on the west bank of the SOuth Platte River <br />to an existing trunk line sewer on the east side of the South platte; and <br /> <br />WHEREAS, the Contractor has installed the discharge line, at,his own ex- <br />pense, for a total cost of Fifty-Five Thousand Fi va Hundred Ninety-one Dollars <br />Fifty-Two Cents ($55,591.52) which cost includes the sum of Fifty--Thousand <br />Eighty-1\-.<) Dollars Fifty cents ($50,082.50) payment to the COntractor and the <br />sum of Five Thousand Five Hundred Nine Dollars 1\-.<) cents ($5,509.02) for <br />engineering fees; and <br /> <br />WHEREAS, the COntractor has requested rein1burserrent of the cost of thJ <br />installation of the discharge line in a letter dated August 27, 1979,whicb <br />letter is attached hereto as Exhibit "e"; and <br /> <br />WHEREAS, the Contractor is a Water and Sanitation District within the State <br />of Colorado i <br /> <br />Page 1 of ~ pages <br />*(See instructions on rever$e of last page.) <br />