My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153935 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153935 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153935
Contractor Name
Brown and Caldwell
Contract Type
Grant
Water District
0
County
Jefferson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />". '. <br /> <br />1697 COI.levard <br />Suite 200 <br />Golden, CO 80401 <br /> <br />. <br /> <br />. <br /> <br />Tel: (303) 239-5400 <br />Fax: (303) 239-5454 <br /> <br />RliceWEO <br />DEe 31 2001 <br /> <br />CoIomdo Water Conserv.,oo '1""., <br /> <br />SHOWN AND <br />CALDWELL <br /> <br />Environmenta! Engineering & Consulting <br />December 28,2001 <br /> <br />Mr. Larry Lang, P.E. <br />Chief, Flood Control Section <br />Colorado Water Conservation Board <br />1313 Sherman St. Room 721 <br />Denver, CO 80203 <br /> <br />SUBJECT: Acceptance of Work Plan, Schedule and Budget for Colorado Water <br />Conservation Board's Chatfield Reservoir Storage Use Patterns Investigation <br /> <br />Dear Mr. Lang: <br /> <br />. <br /> <br />In accordance with ilie November 26, 2001 telephone call from Mr. Jim Sharp, Purchasing <br />Department, and the December 28 meeting wiili you and Mr. Joe Busto, I have prepared a <br />-detailed,-cosf-estimate ,Jel'-eempleting---the"'-€hatfieh:l:-Reservuir-Storage'- UsePatfems <br />Investigation as detailed in the Work Plan developed in our December 28 meeting. The <br />Work Plan is attached as Exhibit A and the detailed cost estimate is attached as Exhibit B. <br />Boili the Work Plan and the budget are acceptable to Brown and Caldwell. <br /> <br />The total cost for completing the tasks detailed in the Work Plan is $39,855 as shown in <br />Exhibit B. <br /> <br />The required schedule, as shown in Exhibit B calls for completion of all work within four <br />monilis of receiving a signed contract. This schedule isacceptableto Brown and Caldwell. <br /> <br />Therefore, we are prepared to start work on this project as soon as we can receive a signed <br />contract from you. <br /> <br />Thank you very much for selecting Brown and Caldwell for this project and we look <br />forward to working wiili you and Joe Busto. <br /> <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.