My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00468
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2010 10:15:00 AM
Creation date
10/5/2006 11:56:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153667
Contractor Name
Wamsley Cattle Company
Contract Type
Loan
Water District
47
County
Jackson
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,':~ <br /> <br />'-.'", <br /> <br />WHEREAS, the Contractor or Borrower understands that this Contract is also a <br />promissory note for the repayment of funds loaned to the Borrower according to the terms <br />set forth herein, <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants <br />herein contained, it is agreed by the parties hereto as follows: <br /> <br />A The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm (hereinafter referred to as the Consultant) to prepare <br />project plans and specifications for the project. Both the Consultant and the project plans <br />and specifications must be approved in writing by the State before construction on the <br />project can commence. For purposes of this paragraph, "construction" includes any real <br />estate and water rights acquisitions. <br /> <br />2, Contract for the construction of said project to a responsible and capable firm or <br />firms acceptable to the State Engineer's Office, <br /> <br />3. Cause construction of the project to be completed within one (1) year of the date <br />of this contract, in accordance with the project plans and specifications and any necessary <br />modification(s) thereof approved by the State, This time may be extended by the State <br />in writing if such time is insufficient because of acts of God or other acts or circumstances <br />beyond the control of the Contractor, The Contractor must produce documented <br />justification of any such acts or circumstances, <br /> <br />4. Require all Construction Firms and their subcontractors to indemnify the State <br />and the Contractor against all liability and loss, and against all claims and actions based <br />upon or arising out of damage or injury, including death, to persons or property, caused <br />by any acts or omissions of those parties or sustained in connection with the performance <br />of any contract related to the project or by conditions created thereby, or baSed upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions, <br /> <br />5, Require all Construction Firms and their subcontractors to maintain during the <br />term of their contracts for project construction the following: <br /> <br />a, Workmen's compensation and employers' liability insurance in the required <br />statutory, amounts, <br /> <br />b, Automobile liability insurance for all vehicles, and comprehensive general <br />liability insurance, both in at least the following amounts: <br /> <br />(1) For any injury to one person in any single occurrence, the sum of <br />One Hundred Fifty Thousand Dollars ($150,000), <br /> <br />Page l of 11 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.