Laserfiche WebLink
<br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CONTENTS, continued <br /> <br />VIII. PROJECT EVALUATION <br /> <br />IX. FINANCIAL PROGRA~ <br />Feasibility of Project <br />Six-Year Cash Flow Schedule <br />Recommendations on Funding <br /> <br />X. CONCLUSIONS AND RECOMMENDATIONS <br /> <br />APPENDIX Al. <br />A2. <br />Bl. <br /> <br />Audit Report (1973) <br />Audit Report (1974)' <br />Comments & Recommendations <br /> <br />PLATES <br />1. <br />2. <br /> <br />Physical Plan - Existing Water System <br />Proposed Initial Improvements (1976-1977) <br /> <br />LIST OF FIGURES <br />I. Design Area (2010) <br />II. Population and Growth <br />III. Water System Improvements (1990,...1995) <br /> <br />LIST OF TABLES <br />1. Climate Data for the Byers, Colorado Station No. 1179 <br />2. Average Water Consumption - Bennett, Colorado <br />3. Comparison of Water Production Values <br />4. Future Water Production Requirements <br />5. Minimum Supply Rate and Storage Requirements <br />6. Fire Hydrant Flow Tests <br />7. Tabulation of Operating, Maintenance & Replacement Costs <br />8. Hookup Projection <br />9. Six-Year Cash Flow Schedule <br /> <br />Page_ <br /> <br />65 <br /> <br />68 <br />68 <br />70 <br />72 <br /> <br />74 <br /> <br />In Rear <br /> <br />32 <br />34 <br />36 <br /> <br />2 <br />8 <br />10 <br />12 <br />14 <br />23 <br />56 <br />64 <br />70 <br />