My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00464
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0001X
Contractor Name
Bennett, Town of
Contract Type
Loan
Water District
0
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Ninimum supply facilities should be capable of producing the average <br /> <br />daily production required during the maximum week with the facilities operat- <br /> <br />ing a maximum of 20 hours per day. Minimum storage facilities should be <br /> <br />adequate, to provide the required fire flow for the required fire duration <br /> <br />time in addition to the peak hour consumption rate less the available supply <br /> <br />rate for the required fire duration time. Ninimum supply rates and storage <br /> <br />volumes are tabulated in Table 5 for 5-year increments and extended through <br /> <br />the year 2010. , <br /> <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.