Laserfiche WebLink
<br />, . <br /> <br />(9. ) PLOTTING TABLE - PROBABLE MAXIMUM GENERAL STORM <br />Time Incremental qp for 1. 00 qp for incre- Incremental Hydrographs <br />Ending, Runoff, 1 inch runoff, mental run- Begin Peak End <br />Hr. Inches sec. -ft. off, sec. -ft. time time time <br />1 0.00 2,994 0 0 0.81 2. 15 <br />2 0.06 2; 994 ISO 1 1. 81 3.15 <br />3 0.11 2,994 329 2 2.81 4. IS <br />4 0.18 2,994 539 3 3.81 5.15 <br />5 0.06 2,994 180 4 4.SI 6. IS <br />6 O.IS 2,994 539 5 5.81 7. IS <br />7 0.18 2,994 539 6 6.81 8.15 <br />8 0.24 2,994 719 7 7.S1 9. 15 <br />9 0.29 2,994 S6S S S. SI 10.15 <br />10 0.42 2,994 1,257 9 9.S1 11.15 <br />11 0.77 2,994 2,305 10 10.S1 12. 15 <br />12 2.63 2,994 7, S74 11 11. SI 13. 15 <br />13 0.00 2,994 12 12. Sl 14.15 <br />14 0.00 2,994 13 13. SI 15. 15 <br />IS 0.00 2,994 14 14. SI 16. 15 <br />16 0.00 2,994 15 IS.Sl 17.15 <br />17 0.00 2,994 16 16. SI 18.15 <br />IS 0.00 2,994 17 17. SI 19. 15 <br /> <br />1 <br />from Step (2) (a. ) (7.) , Column 5 <br /> <br />- 27 - <br />