Laserfiche WebLink
<br />PLOTTING TABLE - ASSUMPTION A <br /> <br /> Time, Incremental q for 1. 00 q for incre- Incremental Hydrographs <br /> Ending Runoff'l irPch runoff, nPental run- Begin Peak End <br /> Hr. Inches sec. -ft. off, sec. - ft. time time time <br /> 0.25 0.09 5,639 508 0 0.43 1. 15 <br /> 0.50 0.64 5,639 3,609 0.25 0.68 1.40 <br /> 0.75 1.19 5,639 6,710 0.50 0.93 1.65 <br /> 1. 00 2.88 5,639 16,240 0.75 1. 18 1. 90 <br /> 1;25 0.60 5,639 3,383 1.00 1. 43 2.15 <br /> 1.50 0.39 5,639 2,199 1.25 1. 68 2.40 <br />"".; <br />., 1. 75 0.27 5,639 1,523 1.50 1. 93 2.65 <br /> 2.00 0.19 5,639 1,071 1.75 2.18 2.90 <br /> 2.25 0.14 5,639 789 2.00 2.43 3.15 <br /> 2.50 0.11 5,639 620 2.25 2.68 3.40 <br /> 2.75 0.03 5,639 169 2.50 2.93 3.65 <br /> 3.00 0.00 5,639 0 2.75 3. 18 3.90 <br /> <br />1 From Step (3.), Column 5, Incremental Direct Runoff <br /> <br />-'"", <br /> <br />- 18 - <br />