Laserfiche WebLink
<br />, <br />.1 <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement betWeen engineerirlg firm and p.t.'oject sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting enginee.cing firm. <br /> <br />3. Approval of detailed plans and specifications by BoaLd <br />staff (plans &nd specifications for stoJ.-age dams and <br />reservoLcs mUSt also be approved by State Enginee.c I 5 <br />office) . <br /> <br />4. <br /> <br />BOaL"a staff approval of bidding for the project. <br />staff present at bid opening fol:' construction. <br /> <br />BaaL'd <br /> <br />5. <br /> <br />Project SpOflSQr may issue the notice of awaL'd and the <br />flotice to proCeed with construction to the cantractoL" <br />(both notices must be approved by the Board staff before <br />they are issu~d). <br /> <br />S <br />I <br />Approval of <br /> <br />6. <br /> <br />Conduct a pre"'construction conference. <br />construction achedule by Boa.cd ataff. <br /> <br />ConstructiOfl C:ommences. The Boa.cd staff makes pe.ciodic <br />inspections dl\.cing constructiorh All change OL-deL's must <br />he approved bY' the Boa.cd staff in advance and befoL-e any <br />construction C)n change items can conunenCe. EmeL.gency <br />items cleaL-ed by telephone. <br /> <br />8. The consultin~ engineer certifies that tne p.coject has <br />beerl completeq according to approved drawings and <br />specificatiollf';, and arranges for final inspection. <br /> <br />7. <br /> <br />9. Final iflspecti.on and accept~nce of as-bUilt project by <br />Board staff. <br /> <br />10. Submittal of 'ls-built drawings to Board staff fOL' <br />approval and ~iling. <br /> <br />\ <br />\ <br />I <br />i <br />