My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153353 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153353 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2010 8:59:04 AM
Creation date
10/5/2006 11:56:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153353
Contractor Name
Farmers Irrigating Ditch and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />.1 <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement betWeen engineerirlg firm and p.t.'oject sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting enginee.cing firm. <br /> <br />3. Approval of detailed plans and specifications by BoaLd <br />staff (plans &nd specifications for stoJ.-age dams and <br />reservoLcs mUSt also be approved by State Enginee.c I 5 <br />office) . <br /> <br />4. <br /> <br />BOaL"a staff approval of bidding for the project. <br />staff present at bid opening fol:' construction. <br /> <br />BaaL'd <br /> <br />5. <br /> <br />Project SpOflSQr may issue the notice of awaL'd and the <br />flotice to proCeed with construction to the cantractoL" <br />(both notices must be approved by the Board staff before <br />they are issu~d). <br /> <br />S <br />I <br />Approval of <br /> <br />6. <br /> <br />Conduct a pre"'construction conference. <br />construction achedule by Boa.cd ataff. <br /> <br />ConstructiOfl C:ommences. The Boa.cd staff makes pe.ciodic <br />inspections dl\.cing constructiorh All change OL-deL's must <br />he approved bY' the Boa.cd staff in advance and befoL-e any <br />construction C)n change items can conunenCe. EmeL.gency <br />items cleaL-ed by telephone. <br /> <br />8. The consultin~ engineer certifies that tne p.coject has <br />beerl completeq according to approved drawings and <br />specificatiollf';, and arranges for final inspection. <br /> <br />7. <br /> <br />9. Final iflspecti.on and accept~nce of as-bUilt project by <br />Board staff. <br /> <br />10. Submittal of 'ls-built drawings to Board staff fOL' <br />approval and ~iling. <br /> <br />\ <br />\ <br />I <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.