<br />Steel pipe liner will be installed along with shotcrete and rock bolts in various repair areas,
<br />Existing concrete lined sections will be repaired and stabilized. Once this is complete,
<br />approximately 800 cubic yards of rock will be removed from a 400-foot section where the
<br />collapse occurred, and that portion of tunnel will be rehabilitated,
<br />
<br />A temporary rail system will also be installed from the west portal, and repairs and bracing work
<br />will be completed on existing timbered supported sections, Portions of the west tunnel will be re-
<br />mined and rehabilitated with steel supports, A trash rack and steel door will be constructed at
<br />the east entrance, and the downstream deflection wall will be repaired.
<br />
<br />Rocky Mountain Consultants (RMC) has prepared engineering designs and cost estimates for
<br />the project. Conceptual plans as prepared by RMC are included in Appendix H,
<br />
<br />The estimated cost of the completed project is $4,1 million, The cost breakdown is summarized
<br />in Table 2. The RMC Preliminary Design report and detailed cost estimate are included in
<br />Appendix C,
<br />
<br />Table 2. Tunnel Water Company
<br />Laramie-Poudre Tunnel Project - Cost Estimate
<br />
<br /> Item Quantity Unit Unit Price $ Amount $
<br />Mobilization 1 Job 32,000 $ 75,000
<br />Improve Access Road 3200 Feet $165,000
<br />Improve Eastern Portal 1 Job $179,000
<br />Remove Muck From Tunnel 800 C,Y. 112,5 $ 90,000
<br />Install Temporary Rail 8,333 Feet 55 $458,315
<br />Steel Pipe 463 Feet 1300 $6D1,900
<br />Rockbolts 363 250 $ 90,750
<br />Steel and Steel Sets For Tunnel Job $234,480
<br />Celluar Grout 805 C,Y, 925 $744,250
<br />Shotcrete 128 C,Y, $239,600
<br />Drill Probe Holes 390 L.F, 25 $ 9,750
<br />Remine and Brace Sections 176 Feet 1020 $179,600
<br />Repair Stilling Basin Job $ 31,500
<br />Regrade and Restore Staging Area & Rd, Job $ 49,000
<br />Remobilize (If Required) Job $140,000
<br />EnQineerinQ Design and Supervision 1 Job $267,850
<br />Contingencv 1 Job 15% $525,000
<br />Legal Assistance Job $ 8,500
<br />U,S, Forest Service Fees Job $ 9,645
<br /> Total $4,099,140
<br />
<br />Implementation Schedule
<br />
<br />RMC is expected to complete the final design by December 2DOO, Construction is expected to
<br />begin December 2000 and to be completed by July 2001,
<br />
<br />Tunnel Water Company
<br />Laramie-Poudre Tunnel Feasibility Study
<br />September 2000 (Updated December 2000)
<br />
<br />Page 10 of15