My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150065 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150065 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2010 1:37:08 PM
Creation date
10/5/2006 11:56:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150065
Contractor Name
Tunnel Water Company, The
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The maximum annual volume that may be diverted was set by U.S, Supreme Court case <br />Wvominq v, Colorado case May 13,1957, and totals 19,875 acre-feet. Records of the State <br />Engineer's Office indicate that the average annual volume has been 15,085 acre-feet. <br /> <br />A summary of water rights and the State Engineer Diversion records for 1998, and 1999 are <br />found in Appendix B, <br /> <br /> <br />c,,.,.~ <br /> <br />Ft. Collins <br />30 Miles <br /> <br />--------~ <br /> <br />, <br />i <br />, , <br />',I'Z,It'lc-o. ',-1...:., ".; <br />. ...... l r' <br /> <br />Location Map <br /> <br />Tunnel Water Company <br />Laramie.Poudre Tunnel Feasibility Study <br />September 2000 (Updated December 2000) <br /> <br />Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.