Laserfiche WebLink
<br />TABLE 5.1 <br />Cost Summary <br /> <br /> Investment Costs Unit Costs of Firm Yield <br /> Road \later ($1000) ($/af/yr) <br /> Relocati on Supply Reservoi r Volune (at) Reservoir Volune (af) <br /> Alternative Scenario 110.000 165.000 Maxinua(l) 110.000 165.000 Maxinua(l) <br /> AS 506,338 579,672 2,236 1,899 <br /> ASJ( 535,083 620,921 1,675 1,363 - <br /> BAM 506,338 631,699 2,046 1,241 <br /> BC 554,732 649,573 1,259 914 <br />2 AS 548,293 622,844 2,413 2,035 <br />2 ASX 577,038 664 , 093 1,801 1,454 <br />2 BAM 548,293 674,871 2,208 1,323 <br />2 BC 596,687 692,746 1,350 961 <br />3 AS 546,299 617,599 2,404 2,018 <br />3 ASX 575,045 661,141 1,795 1,451 <br />3 BAM 546,299 671,919 2,200 1,317 <br />3 BC 594,693 689,794 1,346 957 <br /> - <br />4 AS 363,717 399,617 413,364 1,635 1,409 1,376 <br />4 ASX 392,463 444,373 454,613 1,240 1,038 1,012 <br />4 BAM 363,717 399,617 465,391 1,496 1,100 927 <br />4 Be 412,111 464,385 483,266 949 741 680 '-' <br />5 AS 365,490 401,390 415,136 1,643 1,415 1,382 <br />5 ASX 394,235 446,146 456,386 1,253 1,042 1,015 <br />5 BAM 365,490 401,390 467,164 1,503 1,105 930 --- <br />5 BC 413,884 466,158 485,039 953 744 683 <br />6 AS 327,784 363,384 377,130 1,483 1,288 1,262 <br />6 ASX 356,229 408,140 418,380 1,140 958 935 <br /> -.: <br />6 BAM 327,784 363,384 429,159 1,357 1,006 843 <br />6 Be 375 ,879 428,153 446,616 870 686 631 <br /> (1)Maximum required volume to obtain maximum firm yield: AS=180,OOO af, ASX=175,000 af, <br /> BAM=230,000 at, 8C=189,000 at. <br /> TABLE 5.2 <br /> Firm Yield in af/yr <br /> Reservoir Size <br />Water SUDDly Scenario 110.000 af 165.000 af Maxi mum(l) <br /> AS 20,000 25,000 26,000 <br /> ASX 30,500 37,500 38,700 <br /> SAM 22,500 33,500 43,200 <br /> Be 42,000 56,000 61,000 <br />(l)Maximum required volume to obtain maximum firm yield: AS=180,000 af, <br />ASX=175,000 af, BAM=230,000 af, BC=189,000 af. <br /> <br />5-4 <br />