My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00456
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0003X
Contractor Name
Clear Creek Project CWRPDA
Contract Type
Loan
Water District
0
County
Clear Creek
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-.J <br /> <br />TUDOR ENGINEERING COMPANY <br /> <br />Mr. Ulrich Kappus <br />June 30, 1989 <br />Page 2 <br /> <br />, <br />-.J <br /> <br />The Clear Creek Project could provide a major recreational attraction to <br />the Denver metropolitan area and to Clear Creek and Gilpin Counties. <br />Recreational opportunities could include activities such as: camping, hiking, <br />boating, and fishing. Recreational areas could be located along the reservoir <br />and throughout a corridor along Cl ear Creek Canyon downstream of the dam. <br />Project benefits beyond water supply and recreation may include improvements to <br />eXisting water quality, flood control to downstream communities, and production <br />of hydroelectric power. <br /> <br />The next step in project development should include further evaluation of <br />the plan for U.S. Highway 6 relocation. The evaluation should consider the <br />long-term needs of the local communities, the highway users, and the Clear Creek <br />water users. Future phases of project planning will require additional <br />investigations to select a specific dam and reservoir site in Clear Creek Canyon, <br />and to identify the environmental and socioeconomic issues to be addressed in <br />an environmental impact statement. As part of future investigations, an advisory <br />committee should be formed to enhance public involvement in the planning stages <br />of this major project. <br /> <br />We appreciate the continued opportunity to conduct these evaluations of <br />the Clear Creek basin. We wish to acknowledge the excellent support and guidance <br />we have received from you and your Project Manager, Ralph Kerr. We look forward <br />to working with you in the future. <br /> <br />-.J <br /> <br />-- <br /> <br />Sincerely, <br /> <br />-.J <br /> <br />TUDOR ENGINEERING COMPANY <br /> <br />~~ <br /> <br />Vice President <br /> <br />---' <br /> <br />Enclosure: As stated <br /> <br />-..i <br />
The URL can be used to link to this page
Your browser does not support the video tag.