Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />:- '..' - .. <br /> <br />.... - -,- <br /> <br />- <br /> <br />-'- <br /> <br />--: - <br /> <br />PROJECT DEVELOPMENT: KEY STEPS AND POTENTIAL SCHEDULE (1) <br /> <br /> YEAR <br /> 1 2 3 -4 6 6 7 8 9 10 11 12 13 1-4 15 16 17 18 19 20 21 22 <br />PHASE I-FEASIBILITY STUDY "\7 PREf ENT IME PF S UDY <br />CONCEPTUAL ANALYSIS <br />SPONSOR EVALUATIONS AND DECISION - - <br />PHASE II-FEASIBILITY STUDY <br />CONTRACTS - <br />PROJECT SELECTION - <br />SPONSOR EVALUATION AND SCOPE OF WORK - <br />INITIAL GEOTECHNICAL STUDIES (FOR SITE SELECTION) IiIii <br />WATER SUPPLY ... <br />EVALUATION OF U.S. HIGHWAY 8 .. <br />SITE SPECIFIC GEOLOGY (PROVE FEASIBILITY OF SEL. SITE) -- <br />FEASIBILITY DESIGNS AND COST ESTIMATES - <br />ENVIRONMENTAL STUDIES <br />LICENSING AND PERMITTING <br />PREPARATION OF ENVIRONMENTAL IMPACT <br />STATEMENT (EIS) jI-. <br />AGENCY REVIEW OF EIS/MODIFICA TlONS <br />PROJECT FINANCING AND FINAL DESIGN <br />PROJECT FINANCING <br />FINAL GEOTECHNICAL STUDIES (ADITS. TRENCHING, ETC.) - <br />PROJECT DESIGN - <br />PREPARATION OF PLANS AND SPECIFICATIONS - <br />CONSTRUCTION <br />ADVERTISE AND AWARD CONSTRUCTION CONTRACT - <br />MOBILIZATION OF CONTRACTOR <br />AND DIVERSION OF STREAM - <br />FOUNDATION PREPARATION <br />CONSTRUCTION OF DAM I <br />ROAD RELOCATION <br />CONSTRUCTION COMPLETE I I I IV <br />(1)THE ACTUAL SCHEDULE FOR IMPLEMENTING A PROJECT WILL DEPEND UPON THE DEMAND FOR COLORADO WATER RESOURCES <br />WATER, THE AVAILABILITY OF PROJECT FUNDING. AND THE SUCCESS OF THE PERMITTING AND POWER DEVELOPMENT AUTHORITY <br />ACTIVITIES. CLEAR CREEK PROJECT <br /> PROJECT DEVELOPMENT <br /> TUOOR ENGINEERING COMPANY <br /> CHERYL SIGNS ENGINEERING <br /> WOODWARD-CL YDE CONSULTANTS <br /> LEONARD RICE CONSULTING WATER ENGINEERS. INC, <br /> MULLER ENGINEERING COMPANY. INC, <br /> DATE: JUNE 1989 FIGURE 1.2 <br />