<br />:.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I
<br />.
<br />I
<br />.
<br />I
<br />.
<br />.
<br />I
<br />I
<br />I
<br />.
<br />I
<br />
<br />Feasibility Report for Dam Safety Modifications to DeWeese Dam
<br />April 22, 1997
<br />
<br />29
<br />
<br />8. REFERENCES
<br />
<br />1. International Engineering Company, Inc., Phase I Inspection Report-National Dam
<br />Safety Program, DeWeese Dam, Custer County, Colorado, July 25,1980,
<br />
<br />2, GEl Consultants, Inc" Safety Evaluation of De Weese Dam, near WestclijJ, Colorado,
<br />December 19,1994,
<br />
<br />3. GEl Consultants, Inc" Field Investigations at DeWeese Dam, near WestclijJ, Colorado,
<br />April 11, 1996,
<br />
<br />4. GEl Consultants, Inc., Inflow Design Flood Report for De Weese Dam, near WestclijJ,
<br />Colorado, April 7, 1995.
<br />
<br />5, U.S. Bureau of Reclamation, Design of Gravity Dams, A Design Manual for Concrete
<br />Gravity Dams, 1976,
<br />
<br />6, Office of the State Engineer, Colorado Department of Natural Resources, Rules and
<br />Regulationsfor Dam Safety and Dam Construction, August 1988,
<br />
<br />7. National Weather Service, Hydrometeorological Report No, 55A, June 1988,
<br />
<br />8, U,S. Bureau of Reclamation, Concrete Manual, A Manual for the Control of Concrete
<br />Construction, Eighth Edition, 1981.
<br />
<br />9, American Concrete Institute, Building Code Requirementsfor Structural Concrete (ACI
<br />318-95), Reported by ACI Committee 318,1995.
<br />
<br />10, R.S, Means Company, Inc" Heavy Construction Cost Data, 11th Annual Edition, 1997,
<br />
<br />11, Fremont Soil Conservation District & Sangre de Cristo RC&D, De Weese Dye Ditch and
<br />Reservoir Company, Evaluation of De Weese Dye Ditch and Reservoir Company Main
<br />Delivery System, February 18, 1988,
<br />
<br />96006\REPORTSIFEAS\TEXT.NEW
<br />
<br />~ GEl Consultants, lnc,
<br />
|