Laserfiche WebLink
<br />~ GEl Consultants, Inc, <br /> <br />96006\REPORTS\fEAS\TEXT,NEW <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />24 <br /> <br />Feasibility Report for Dam Safety Modifications to DeWeese Dam <br />April 22, 1997 <br /> <br />should have a useful life of 50 to 100 years, Dam maintenance costs would not be expected to <br />increase after construction, but could decrease since periodic patching of the crest concrete <br />would no longer be necessary, For this report, we have assumed no net change in the <br />Company's operation, maintenance and replacement costs for the dam as a direct result of the <br />construction of the proposed dam safety modifications, <br /> <br />6.4 PROPOSED FINANCIAL PROGRAM <br /> <br />Table 8 presents a potential financial program for completion of dam safety modifications at <br />DeWeese Dam, In deriving this table, it has been assumed that the Company will proceed with <br />development of Alternative No, I - Crest Replacement, according to the generalized <br />implementation schedule described in Section 7,2, The information provided in Table 8 is to <br />illustrate the financial feasibility of the propo~ed work using reasonable funding sources, It is <br />not the only potential financial program available, but is used in this report to represent a <br />conservative approach to project financing utilizing funds available from the CWCR <br /> <br />The following assumptions were used in the development of the financial program presented in <br />Table 8: <br /> <br />1. The total estimated project capital cost, including cost escalation during project <br />implementation from 1997 to 1999 at 3,0 percent per year, is $839,100, <br /> <br />2. Project fmancing will be provided by a combination of a low-interest <br />Construction Fund loan from the CWCB, with the remaining project capital costs <br />paid directly by the Company, <br /> <br />3. The CWCB will finance 75 percent of the total project capital costs through a <br />Construction Fund loan, The terms of the loan are assumed for this report to be <br />4.5 percent interest over 30 years, The total project capital costs will include <br />Feasibility Study costs, final de~ign engineering, construction costs, and costs for <br />construction engineering and administration; less a $5000 grant provided to the <br />Company by the CWCB in 1996, <br /> <br />4, The Company will fund the remaining 25 percent of the total project capital costs, <br />The Company's share of project capital costs will generally be derived from <br />increased assessments to the shareholders, A portion of the Company's costs are <br />assumed to be offset by a grant from Colorado Lottery funds. The CD OW has <br />offered to support the Company's request for these funds to support the <br />recreational benefits provided at the reservoir. <br />