Laserfiche WebLink
<br />J::.At1.LU.LT tl <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTROCTION FUND PROGRA~ PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm., <br /> <br />3. Approval of detailed ~lans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />Office). <br /> <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />6. ' <br /> <br />tru f.'" <br />,y~..d b <br />;~~ <br />\_,lf~ ..~.~ <br />Cond uct a pre-construct' .'"'4J,~;,~o...... erence. Approval of . <br />construction SCh~~bY ~8 staff. <br /> <br />Construction com,~'ij~~~~he Board staff makes periodic <br />inspections~,' " ng ~qdn~~uction. All change orders must <br />be approv~bf<<,. ~~he rd staff in advance and before any <br />construc~~9P cha e items can commence. Emergency <br />items cleare~~ telephone. <br /> <br />The consulting ~ineer certifies that the project' has, <br />been camoleted according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />Project sponsor may issue- <br />not ice to proceed wi th c <br />(both notices must be p <br />they are issued). <br /> <br /> <br />ice of award and the <br />n to the contractor <br />the Board staff before <br /> <br />5. <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. <br /> <br />Submittal of as-built drawings to Board staff for <br />approval and tiling. <br /> <br />EXHIBIT B <br /> <br />102 <br />sChed/a <br />