My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00452
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:55:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0029X
Contractor Name
Trinidad Project USBR 1964
Contract Type
Miscellaneous
Water District
0
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />nydrology' <br /> <br />spill from the John Martin Reservoir. As a result of these <br />operating criteria, average stream flow below the project will <br />be about the same in the future as it. has been in the past. <br /> <br />Estimated project effects on downstream flow for each year <br />of the study periOd are shown in table 8. Actually, a slight <br />increase 1n usable flows available to tbe downstream users is <br />predicted as the net effect. of' the project.' Important factors <br />here are more stable return .flows, a decrease in ch~el losses <br />in flOOd periods and a small reduction in. John Martin spills~ <br /> <br />..~. <br /> <br />The most recent.modificationin the plan of operation-- <br />priority diversions when the project supply is exhausted and <br />separate storage account for Model--will have no significant <br />effect on downstream users. <br /> <br />21 <br /> <br />Rev, 9/64 <br /> <br />.... <br /> <br />..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.