My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00452
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:55:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0029X
Contractor Name
Trinidad Project USBR 1964
Contract Type
Miscellaneous
Water District
0
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Hydrology <br /> <br />Future Use <br /> <br />Any improvement in vater supply conditions must be accomplished <br />by increasing the irrigation efficiency of existing supplies. This <br />type of development is imperative because there are nO substantial <br />new water supplies available to be developed. The dominant.aspect <br />of future project operations are, therefore, concerned with improving <br />the water use efficiency. <br /> <br />All future project diversions should be limited to actual <br />reQuirements for the 19,717 acres of irrigable lands. Releases of <br />water stored in the reservoir should be made only as needed to <br />supplement natural flovs in meeting these requirements. Water <br />rights for the area, including that for the Model Reservoir, should <br />be exercised for the benefit of all irrigable lands. Priority of <br />use, as between these vater rights, should be exercised only when <br />the stored project water supply fails .to meet the requirements. <br /> <br />, <br />-,.1 <br /> <br />Irrigation season flows in excess of the requirements and <br />most winter flows will become storable under the Model decree in <br />Trinidad Reservoir. In effect, the reservoir would store that <br />portion of the historic diversion in excess of the actual <br />requirements, <br /> <br />Project Operation Studies <br /> <br />An operation study was prepared using the criteria that all <br />project lands would share the water supply equally. The results <br />indicated that an average of 51,100 acre-feet per year could be <br />diverted as needeci to meet the actual requirements. This q,uanti ty <br />is greater by 13,800 aCre-feet per year than that used efficiently <br />in historic operations to meet requirements. Table 6 is a <br />summarization of the project operation studies. <br /> <br />Modified Operation Study <br /> <br />At the request of the Purgatoire River Water Conservancy <br />District, a modified operation study was made which recognized <br />and brought out some advantages to the water users holding the <br /> <br /> <br />11 <br /> <br />,...., .' <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.