My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00452
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:55:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0029X
Contractor Name
Trinidad Project USBR 1964
Contract Type
Miscellaneous
Water District
0
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PART I <br /> <br />INTRODUCTION AND SUMMARY <br /> <br />PURPOSE OF REPORT <br /> <br />The Trinidad Dam and Reservoir, authorized for construction by <br />the Corps of Engineers, will serve the functions of flood control, <br />irrigation, fish and wildlife, and recreation. The irrigation function <br />consists of regulating the water supply for an existing privately <br />developed irrigated. area located in the semiarid Purgatoire River Basin <br />in south central Colorado, Eleven privately owned ditch.systems serve <br />the area primarily by direct flow rights from the PUrgatoire River. <br />One of the ditch systems, the Model Land and Irrigation Company, has <br />a 20,000 acre-foot storage right and a storage reservoir; however, <br />the. capacity of that reservoir has been reduced from its original <br />20,000 acre-feet to less than 6,000 acre-feet by sedimentation, This <br />report presents a plan for the irrigation function of the project. <br />Exhibit 1 shows the location of the project. <br /> <br />BACKGROUND INFORMATION <br /> <br />The Bureau of Reclamation initiated preliminary studies on <br />irrigation improvements for the area as early as 1937. The Corps of <br />Engineers prior to 1950 had planned to construct levies and channel <br />improvements for flood protection through the city of Trinidad, <br />However, the advantages of a dual-purpose reservoir for both flood <br />control and irrigation were recognized, Cooperative studies were <br />conducted by'the two agencies during 1952 and 1953, These studies <br />resulted in the preparation of a Review Report by the Corps of <br />Engineers in June 1953 which was printed in 1957 as House .Document <br />No. 325, 84th Congress, 2d Session, The Review Report indicated the <br />need for detailed land classification studies and other investigations <br />essential to irrigation under the proposed Trinidad Reservoir. <br /> <br />AUTHORIZATION <br /> <br />Construction of Trinidad Dam and Reservoir by the Corps of <br />Engineers was authorized by.the enactment of Public Law 85-500, <br />85th Congress, S. 3910, July 3, 1958. Shortly afterwards, funds <br /> <br />-- <br /> <br />"'-. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.