Laserfiche WebLink
<br />'~') <br /> <br />SCHEDULE A <br /> <br />COLORAOO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed pldns ~nd specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />\ <br />\ <br />I <br />! <br /> <br />... <br /> <br />Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />5. <br /> <br />Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board stdff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can r.ommence. Emergency <br />items cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. <br /> <br />Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. <br /> <br />Submittal of as-built drawings to Ooard staff for <br />approval and filing. <br /> <br />. ~ \i ;':if>~,' ~ <br />1,"~{'if" 'J L <br />~'J;l,I:;: <br /> <br />,. <br />i" <br /> <br />I>isk No. 102 <br />l;wch / t:ulI/I'UIl (:..ochcd /.1) 1 <br />