My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00443
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153022
Contractor Name
Rifle, City and Town of DeBeque
Contract Type
Grant
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Furm ().AC-02 <br /> <br />'.-"'" <br /> <br />. <br /> <br />. !. ., ?c7~ -/'1'/0 <br />D~PAKtMENT OR AGENCY N <br />34 04 00 <br />CONTRACT ROUTING NUMBER <br />SO? <br /> <br /> <br />,. <br /> <br />~, CONTRACT <br /> <br />'~~CT' made this 1st day of October <br />fe orado for the use and benefit of the Department of "1 <br />_-~ Co do Water Conservation Board <br />: r1~--Y. after referred to as the State, and "2 Nelson, Haley, pa.tterson and <br />::z:::.;~0 Horizon Drive. Grand Junction. Colorado 81501 <br />hereinafter referred to as the contractor, <br /> <br />$6,205 <br /> <br />197..5., by and between the <br />Natural Resources, <br /> <br />Quirk, <br /> <br />Inc. , <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund Number .1001 . <br />G/L Account Number 52087, Contract Encumbrance Numbere/.s..30..2~; and .yor) K <br /> <br />WHEREAS, re(luired 31'proval, clearance and coordination has been a~complished from and with appropriate <br />agencies; and <br /> <br />WHEREAS, 'Jpursuant to the provisions of 31-60-119, Colorado <br />Revised statutes 1973. as amended, the Colo~ado Water Conservation <br />Board is authorized to construct certain water projects for the <br />benefit of the people of the state of Colorado; and <br /> <br />WHEREAS, the city of Rifle has made application to the Colorado <br />Water Conservation Board for the construction of a water project <br />for the purpose of improving its municipal water supply; and <br /> <br />WHEREAS, the contractor is a professional engineering firm <br />within the state of Colorado and has previously done considerable <br />water-related work for the city of Rifle and various other <br />municipalities in Colorado; <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. The Contractor agrees to prepare a feasibility report <br />directed to the problem of improving the municipal water of the <br />City of Rifle in accordance with a proposal for project feasibility <br />report prepared by the Contractor and approved by the Colorado <br />Water Conservation Board, received September 8, 1975, which proposal <br />is attached hereto as Appendix A and made a part of this contract. <br /> <br />2. Thirty (30) copies of the report called for in this <br />contract shall be furnished to the State not later than January 15, <br />1976, unless such time is extended by mutual agreement of the <br />parties hereto. <br /> <br />3. As compensation for the services of the contractor, the <br />state agrees to pay the contractor the sum of six Thousand Two <br />Hundred and Five Dollars ($6,205) in the manner following: <br /> <br />a. Sixty percent (6~~), to wit, Three Thousand Seven <br />Hundred and TWenty-Three Dollars ($3,723) of the total amount due <br />in two (2) monthly installments of One Thousand Eight Hundred Sixty <br />One Dollars and Fifty Cents ($1,861.50) each, commencing on <br />November 15, 1975. <br />b. The remaining forty percent (40%), to wit, Two <br />Thousand Four Hundred and Eighty-Two Dollars ($2,482) within thirty <br />(30) days following receipt and acceptance of the written report <br />specified in paragraph 2 of this contract. <br /> <br />4. This contract is personal in nature and assignment of <br />performance by the contractor to another is prohibited unless prior <br />approval in writing is granted by the State. <br /> <br />Page I oL_~_ pages <br />.(See instructions on reverse of last page.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.