My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153773 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153773 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153773
Contractor Name
Morrison, Town of
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />----------------~-- <br /> <br />YEAR: <br /> <br />1952 <br /> <br />. TABLE 2C <br />TOWN OF MORRISON <br />WATER BALANCE OF DEMAND, WATER RIGHTS AND STORAGE <br />All Values in Acre-Feet <br /> <br />Page 1 ot 2 <br /> <br /> Turf Grass MUNICIPAL DEMAND AVAILABLE SUPPLIES <br /> Consumptive Domestic DIRECT FLOW WATER RIGHTS STORAGE RIGHTS <br />Month Use In.House Irrigation Total Domestic Hodgson Warrior Pioneer Union Total Warrior lewls & StrolJ.. Total <br /> (3.5 cis) (35 shares) (2 shares) (4 shares) (3.125 shares) (100 Inch..) <br /> fS'+C61+(7)+f'J (JOJ+(llJ <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) <br />January 0.00 42.10 0.00 42.10 42.10 42.10 <br />February 0.00 38.03 0.00 38.03 38.03 38.03 <br />March 0.00 42.10 0.00 42.10 42.10 42.10 <br />April 0.05 40.74 8.47 49.21 42.80 8.04 36.40 87.24 5.00 0.00 5.00 <br />May 0.12 42.10 20.32 62.42 44.30 19.55 113.10 176.95 12.50 85.40 97.90 <br />~une 0.49 40.74 82.96 123.70 42.80 22.71 109.50 175.01 15.00 100.00 115.00 <br />~uly 0.50 42.10 84.65 126.75 44.30 14.28 62.70 121.28 15.00 86.80 101.80 <br />August 0.35 42.10 59.26 101.36 44.30 8.23 29.70 82.23 12.87 21.00 33.87 <br />September 0.28 40.74 47.41 88.15 42.80 3.43 0.30 46.53 4.64 0.00 4.64 <br />October 0.15 42.10 25.40 67.50 44.30 1.87 0.00 46.17 0.00 0.00 0.00 <br />November 0.00 40.74 0.00 40.74 40.74 40.74 <br />. December 0.00 42.10 0.00 42.10 42.10 42.10 <br />ITOr AL I 1.94 495.70 328.46 824.15 205_07 305.60 78.13 351.70 940.50 65.00 293.20 358.20 <br /> <br />Date: 08-Jul-96 <br />McLaughlin Water EngIneers, Ltd. <br />
The URL can be used to link to this page
Your browser does not support the video tag.