My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153773 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153773 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153773
Contractor Name
Morrison, Town of
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />i <br />~ <br /> <br />~ <br /> <br />12. Contract Documents and Final Design Drawings, Town of Morrison, Expansion of Water <br />Treatment Plant, McLaughlin Water Engineers, Ltd., Contract N' 27, May 1985. <br /> <br />13. Town of Monison Subdivision Regulations, McLaughlin Water Engineers, Ltd., 1985. <br /> <br />14. Utilities SeNice Planning for Monison Interchange Center, McLaughlin Water Engineers, <br />Ltd., June 30,1989. <br /> <br />15. Water and Sewer Utilities Fee Analyses for the Town of Morrison, McLaughlin Water <br />Engineers, Ltd., September 1992. <br /> <br />16. Final Report, Monison Water Supply Study, CH2M Hill, September 16, 1992. <br /> <br />17. Results of the Comprehensive Performance Evaluation of the Town of Morrison Water <br />Treatment Plant, USEPA and Process Application, Inc., 1993. <br /> <br />18. Annexation Agreement between the Town of Morrison and the Cooley Gravel Company, <br />October 31,1994. <br /> <br />19. Feasibility Analysis of Water System Improvements for the Town of Morrison, WRC <br />Engineering, Revised November 1, 1994. <br /> <br />20. Addendum 1 to above report, WRC Engineering, November 1994. <br /> <br />21. Preliminary Feasibility Analysis for Water and Sewer Extensions to the Fort, WRC <br />Engineering, November 10, 1994. <br /> <br />22. Rooney Valley Water Supply Report, Rooney Valley Water Committee (Rolf Paul and <br />Dick Scott, Morrison Representatives), February 3, 1995. <br /> <br />23. Preliminary Feasibility Analysis for Water Supply Extension to Red Rocks Pari<. WRC <br />Engineering, October 1995, Revised January 1996. <br /> <br />24. Multiple Design Drawings and As-Built Drawings of Water Distribution Systems prepared. <br />by McLaughlin Water Engineers, Ltd. <br /> <br />70-0BO.035:MSTR..$'LN <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.