My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153773 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153773 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153773
Contractor Name
Morrison, Town of
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I~_........;;. <br />- " ~ <br /> <br />Ie ..... . '.~ <br /> <br />McLaughlin Water Engineers, Ltd. <br /> <br />-.l:.iHUI&~ <br /> <br />February 12, 1997 <br /> <br />2420 Alcott Street, Denver, Colorado 80211 (303) 458-5550 <br />Facsimile (303) 480-9766 <br />mwe@ecentral.com <br /> <br />Colorado Water Conservation Board <br />Attn: Mr. Bill Green <br />1313 Sherman Street <br />Denver, Colorado 60203 <br /> <br />Re: <br /> <br />Town of Morrison <br /> <br />Dear Mr, Green: <br /> <br />RONALD C McLAUGHLIN <br />LEOM.EISEL <br />HALFORD E. ERICKSON <br />WILLIAM R. KENDALL <br />RALPH L. TOREN <br />TERRENCE p, KENYON <br />RICHARD E McLAUGHLIN <br />RONALD I. MCLAUGHLIN <br /> <br />GENE A BURRELL <br />MICHAEL E. MERCER <br />JOHN M. PFLAUM <br />MICHAEL R GALUZZI <br />SCOlT E. LEHMAN <br />BRIAN S. KOLSTAD <br />G. DEAN DEROSIER <br />EDWARD D. BAlN <br />BRIAN E (HEV AllER <br />DANIEL F. BLAHA <br />LEANDER L URMY <br />DANIEL M. PETRAMALA <br />RONALD D. LUCERO <br /> <br />Submitted attached is the Feasibility Plan Update for Morrison's raw water supply project. <br /> <br />This Report modifies, and is an update to, the Feasibility Analysis prepared by WRC Engineering, <br />dated November 1, 1994, and previously submitted to the CWCB, The project proposed herein has <br />the same purpose of that previously proposed, i,e, to deliver raw water from Bear-Greek to the <br />existing treatment plant and operating reservoir <br /> <br />The revised plan retains the basic gravity flow system, The project cost estimate results in an initial <br />budget reduction estimated to be approximately $200,000. The proposed improvements do not <br />include replacement of the existing diversion dam, However, the dam appears to be in good <br />condition with a low probability of reqiring near-future replacement. The rationale for the plan <br />revisions was developed in the Master Plan Report, Water Supply System for the Town of <br />Morrison, McLaughlin Water Engineers, LId" dated July 1996, which is appended to this document. <br /> <br /> <br />Enclosure <br /> <br />cc: Mary Poe, Mayor <br /> <br /> <br />RCM:es/70.0eO.039PIRCM-2 <br /> <br />ASPEN, co PHOENIX, AZ <br />(970) 925-1920 (602)248.7'702 <br /> <br />I!il ~. -..lI._ .... - :r~ 1 erll ~.La'L ~"~~~!1~~~r'.;:r,,:,_.' <br /> <br />!COMPLETE ENG1NEER1NG SERVICES IN: WATER RIGHTS AND RESOURCES WATER TREATMENT A,'lDDISTRmUT10N SUBSURFACE DRAINAGE IRRIGATION FOU/,;'TAINS STORM DRAINAGE ANDfl.OODCO'\TROL <br />J WASTEWATER COLLECTIONiREATMENT AND REUSE FIRE PROTECTION WATER BASED RECREATION SPECIALlY HYDRAUUCS RATE STUDIES AND UTILmES ECONOMICS <br />
The URL can be used to link to this page
Your browser does not support the video tag.