My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153773 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153773 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153773
Contractor Name
Morrison, Town of
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />~MWE; <br />~- _.._--~..-",... .,.-." <br />"'J_' ~_ <br /> <br />I <br /> <br />McLaughlin Water Engineers, Ltd. <br /> <br />- ~ ~.~7~';~::'. .-~ <br /> <br />July 22, 1996 <br /> <br />2420 Alcott Street, Denver, Colorado 80211 (303) 458-5550 <br />Facsimile (303) 480-9766 <br />103060,1344 @ compuserve.com <br /> <br />I <br /> <br />RONALDC McLA:"'GH:"I~ <br />LOOM EISEL <br />HALFORD E ERJCKSO...... <br />WILLIAM R Kr~DALL <br />RALPH l TOI\E'\ <br />TERRf.....CE r K[.'.;YO;-.; <br />RlCHARDE Md..AL:GHLI" <br />RO~Al.D J MCLAL'GHU!\" <br /> <br />I <br /> <br />Mary Poe, Mayor <br />Board of Trustees <br />Town of Morrison <br />P.O, Box 95 <br />Morrison, Colorado 80465 <br /> <br />GENE A BURR:!.ll <br />MICHAEl. E MERCER <br />'OHI\: M. PFLAL'M <br />MiCHAEL R GALt.:ZZl <br />SCOTr E lEH'-1.A!'-' <br />BRIAN S. K01.5l AD <br />G DEAN DEROSIER <br />EDWARD D BA:I-.: <br />BRIANt CHE\'ALIER <br />DA."OIELF.BIJ.HA <br /> <br />I <br /> <br />I <br /> <br />RE: <br /> <br />Water Supply System <br /> <br />). HAROLD ROBERTS <br />LEA.''DERL UR..""Y <br />DA1\JEl M. PETRAMALA <br />RO~AlD 0 LUCERO <br /> <br />I <br /> <br />Ladies and Gentlemen: <br /> <br />I <br /> <br />Submitted attached is our Master Plan, Water Supply System for the Town of Morrison, <br /> <br />I <br /> <br />The long-range facility plan is illustrated on Drawing IV-A, at the back of the report, Based on <br />probable near-future needs, a 5 - 7 year initial capital improvements program (CIP) is outlined <br />and preliminarily cost estimated in Section IV. <br /> <br />I <br /> <br />We will be available to review the report with the Board and/or staft, <br /> <br />I <br /> <br />Enclosure <br /> <br /> <br />-IUd f) /Jil <br /> <br />I <br /> <br />I <br /> <br />Robert D, Krehbiel <br /> <br />I <br /> <br />I <br /> <br />Revised 9/11/96 <br /> <br />I <br /> <br />I <br /> <br />RCM:d)n\'7l><l8O.D35IRCM-l <br /> <br />I <br /> <br />ASPEN, co <br />(970)915-1920 <br /> <br />PHOENIX, AZ <br />(602)245-1702 <br /> <br />- <br /> <br />~-~ <br /> <br />-, <br /> <br />- <br /> <br />~~ <br /> <br />_.~... <br /> <br />...- <br /> <br />~.~._....~~:~.:: <br /> <br />COMPUTEENGINEfJUNC; SERVICESlN; WATER RIGHTS AND RESOl'll:CES WATER TRL\TME~'T A!\.'DOlSTRIBU'TlON SUBSURFACE DRAINAGE IRRIGATION FOU~'TAIN5 STORM DRAJ1"AGE ANDFlOODC('J~'TROl <br />WASTEWATER COL.L.ECTION nEATMEJ'I.'T AND REUSE ARE PROTECTION WATER BASED RECJl.E.ATION SPEGALTY HYDRAUUCS RATE STUDIES A!>:D lnlUTIES ECO~OM1C5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.