Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Operating Expenses <br />The past three year (1993, 94, 95) actual operating expenses have been taken from audit reports <br />prepared by Vern Schooneveld and Co., Inc, 1996 values were provided by Sharon Blackstock, <br />Town Clerk, based on costs through October and staff projections through the end of the year, <br /> <br />The pro forma average year expenses have been estimated based on recent experience, together <br />with input from staff and a general knowledge of the system, Distribution system replacements, <br />when needed, have been left under the Repair and Maintenance line item; new improvements, <br />including associated engineering and legal costs, are shown as a capital item under System <br />Improvements, <br /> <br />Capital Program <br />As summarized in Section II, the estimated budget for the new raw water improvements is <br />$490,000. In addition, the Town is committed to rehabilitate and calibrate all customer meters so <br />that they can practically be used for billing, The estimated cost for this work is about $20,000. A <br />summary of the 1997 capital project follows: <br /> <br />Total <br /> <br />$490,000 <br />20.000 <br />$510,000 <br /> <br />Budget for raw water improvements <br />Budget for meter upgrades <br /> <br />Dollar contribution by Morrison <br />CWCB loan <br /> <br />$143,000 <br />$367,000 <br /> <br />Level debt service for the $367,000, 30-year, 5% loan would be $23,874/year. <br /> <br />Service Charges <br />Required service charge income is derived by deducting all other income sources from the average <br />annual budget requirement. As shown in the pro forma column of Table III-A, this results in a <br />design service charge income of $136,000, based on 1996 dollar value - or a rate increase of <br />about 5%. The rate level was determined with the goal of producing approximately $25,000 net <br />operating reserve per year to fund miscellaneous replacements and betterments, Such increase <br />has been considered reasonable by the Town Board as a matter of determining project feasibility. <br /> <br />70-OBO.039P:REPORT <br /> <br />III-2 <br />