My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153773 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153773 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153773
Contractor Name
Morrison, Town of
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Operating Expenses <br />The past three year (1993, 94, 95) actual operating expenses have been taken from audit reports <br />prepared by Vern Schooneveld and Co., Inc, 1996 values were provided by Sharon Blackstock, <br />Town Clerk, based on costs through October and staff projections through the end of the year, <br /> <br />The pro forma average year expenses have been estimated based on recent experience, together <br />with input from staff and a general knowledge of the system, Distribution system replacements, <br />when needed, have been left under the Repair and Maintenance line item; new improvements, <br />including associated engineering and legal costs, are shown as a capital item under System <br />Improvements, <br /> <br />Capital Program <br />As summarized in Section II, the estimated budget for the new raw water improvements is <br />$490,000. In addition, the Town is committed to rehabilitate and calibrate all customer meters so <br />that they can practically be used for billing, The estimated cost for this work is about $20,000. A <br />summary of the 1997 capital project follows: <br /> <br />Total <br /> <br />$490,000 <br />20.000 <br />$510,000 <br /> <br />Budget for raw water improvements <br />Budget for meter upgrades <br /> <br />Dollar contribution by Morrison <br />CWCB loan <br /> <br />$143,000 <br />$367,000 <br /> <br />Level debt service for the $367,000, 30-year, 5% loan would be $23,874/year. <br /> <br />Service Charges <br />Required service charge income is derived by deducting all other income sources from the average <br />annual budget requirement. As shown in the pro forma column of Table III-A, this results in a <br />design service charge income of $136,000, based on 1996 dollar value - or a rate increase of <br />about 5%. The rate level was determined with the goal of producing approximately $25,000 net <br />operating reserve per year to fund miscellaneous replacements and betterments, Such increase <br />has been considered reasonable by the Town Board as a matter of determining project feasibility. <br /> <br />70-OBO.039P:REPORT <br /> <br />III-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.