My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00441
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153459
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />or in planning to meet future water needs. Future populations and water <br /> <br />demands, however, are subject to many factors which cannot be accurately <br /> <br /> <br />forecast; consequently, this study examined a range of possible growth <br /> <br />rates over the next three decades. The reliability of the City's water <br /> <br /> <br />supply (including the anticipated gain in future water supplies due to <br /> <br /> <br />development) was estimated for each of six planning scenarios; these <br /> <br /> <br />scenarios correspond to projected levels of development in the years 2000 <br /> <br /> <br />and 2015 under low, moderate and high growth rates. <br /> <br />I <br /> <br />Total Yater Supply Available to City - The physical availability of water <br />in the CBT and Yindy Gap projects as well as native streamflow derived from <br />the Big Thompson watershed was determined. It was necessary to determine <br />what portion of the physical supply could be diverted for City use under <br />Colorado Yater Law and the management policies of the NCYCD and HS-NCYCD. <br />For the Big Thompson River direct-flow rights, this determination entails <br />allocation of available water in accordance with water rights and the terms <br />of the Loveland Transfer Decree (Yater Case Number 82-CY-202A). The <br />availability of CBT water during any year will be partially dependent upon <br />the annual "quota" set by the NCYCD; the quota defines the percentage of an <br />owners shares which may be delivered in a given year. <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Evaluation of System Yield - The results of the previous steps produced a <br />1000-year monthly record of the total quantity of water theoretically <br />available to the City. System yield and reliability were determined by <br />using this 1000-year record of available water as inflow to the City water <br />treatment plant. For each month, the City demand was compared to the <br />available supply. Any excess water from rights granted in the Transfer <br />Decree was stored in Loveland's existing Green Ridge Glade reservoir for <br />future use subject to capacity, operational and legal constraints. <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />If the demand exceeded the available supply (including storage) in any <br />month, the shortage was recorded as a "deficit" and that month was <br />identified as a "failure", i.e., a failure to meet the specified demand. <br />The reliability of the system was measured by the probability of failure. <br /> <br />Hi <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.