My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00441
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153459
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Loveland <br />Phase I <br />Drought Study <br /> <br />EXECUTIVE SUMMARY <br /> <br />PURPOSE <br /> <br />The City of Loveland, Vater/Vastewater Department retained Camp Dresser & <br />McKee Inc. (CDM) to conduct an analysis of the ability of the City's water <br />supply sources to deliver water during selected drought conditions. This <br />drought analysis was conducted as the first phase of a three-phase water <br />supply study which (1) assesses drought impacts on the City's water supply <br />system and recommends a drought protection level, (2) identifies and <br />quantifies potential alternatives to mitigate drought impacts, and <br />describes the type(s), size(s), location(s) and implementation schedule(s) <br />for the recommended alternative, and (3) conducts a feasibility study for <br />the CVCB of the recommended drought mitigation alternative. <br /> <br />METHODOLOGY <br /> <br />Vater Availability - The City's raw water sources include the following: <br /> <br />1. Big Thompson River direct-flow water rights. <br /> <br />2. Ownership in a number of private irrigation ditch and reservoir <br />companies. <br /> <br />3. Ownership of Colorado-Big Thompson Project (CBT) units. <br /> <br />4. Ownership of Vindy Gap Project (VGP) units. <br /> <br />Both the CBT and Vindy Gap projects derive their supply from streams in the <br />Upper Colorado River Basin. Conveyance facilities (e.g., Adams Tunnel, <br />Dille Tunnel, Charles Hansen Feeder Canal, etc.) are operated and <br />maintained by the Northern Colorado Vater Conservancy District (NCVCD) and <br />Municipal Subdistrict of the NCVCD (MS-NCVCD) in partnership with the <br /> <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.