My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00441
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153459
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />period the native streamflow is typically insufficient to meet irrigation <br />demands and transbasin water (CBT) constitutes a significant portion of the <br />water in the river. The storage season typically runs from November <br />through April. Discharge from the Loveland Wastewater Treatment Plant and <br />transbasin diversion of CBT water for storage may provide the only source <br />of streamflow in some reaches. <br /> <br />4.3 AUGMENTATION OF HISTORIC STREAMFLOW RECORD FOR BIG THOMPSON RIVER <br /> <br />The USGS streamflow gauge at the mouth of the canyon (6.0 miles east of <br />Drake, Colorado) has been in operation since January of 1927 through the <br />present time. This historic record is not continuous, the following gaps <br />are presen t: <br /> <br />0 October 1928 - May 1929 <br />0 1929 - 1932 (November through March values are missing) <br />0 October 1933 - April 1938 (Station discontinued; no records) <br />0 October 1950 - March 1951 <br />0 August 1979 - April 1980 <br /> <br />The first step in this study task involved correction of the gauge record <br />to account for diversions through the Dille Tunnel for hydroelectric <br />operations of the USBR Big Thompson Hydroelectric Plant at the mouth of the <br />canyon. Big Thompson streamflow is diverted above the gauge and <br />consequently not recorded at the gauge. Outflow from the Hydroelectric <br />Plant is returned to the river below the gauge. These Dille Tunnel <br />diversions must be added to the gauge reading each month to accurately <br />represent the quantity of "native" water in the river and available to <br />downstream users. Monthly diversion records were obtained by the City from <br />the USBR and provided to CDM; this data was used to correct the gauge <br />record. Average streamflows for native Big Thompson streamflow were <br />computed from this corrected gauge record; these values are given in Table <br />4-1 and illustrate the seasonal changes described in Section 4.1. <br /> <br />4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.