My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00438
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 9:35:26 AM
Creation date
10/5/2006 11:55:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153837
Contractor Name
Chatfield South Water District
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 17j. <br />November 24, 1997 (Updated December 1, 1997) <br />Page 3 <br /> <br />COLLATERAL <br /> <br />The District will receive revenues from its water customers. The CWCB will take a security <br />interest in this stream of revenues, and will be in a parity position with all debts of the District. <br /> <br />The District has taxing authority, and will own water rights that can be used as collateral. <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />I. That a Construction Fund Authorization in an amount of $500,000, not to exceed 75% of <br />actual cost, be recommended for the Chatfield South Water District to purchase water <br />rights and to pay for the usual and customary costs of legal and engineering services <br />needed to transfer these water rights to District use, and <br /> <br />2. That the fmancing terms for this Construction Fund Authorization shall be at an annual <br />percentage rate equal to the "Standard" income rate for a municipality (as set by the <br />CWCB November 24 1997), for a duration of 20 vears, and <br /> <br />3. That loan approval shall be contingent upon an appraisal of the value of the water rights <br />to be acquired, and upon all standard contracting provisions of the CWCB, as <br />determined by the CWCB Director, and <br /> <br />4. That collateral for the loan shall be a security interest in the stream of income derived by <br />the District from the sale of water, and a security interest in the water rights purchased. <br /> <br />Action Taken bv the CWCB November 25. 1997: <br /> <br />The CWCB approved the Staff recommendation with the additioual provision that the loan <br />may be nsed to refmance a purchase of raw water rights that has already been completed, if <br />approved by the CWCB Director. The interest rate for the loan will be 4.75%. In addition, <br />the District, as a condition of contracting must properly approve the nse of water rights as <br />collateral. <br /> <br />Attachments <br />D:\msword\ChatficldSo97 .memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.