My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00435
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153399
Contractor Name
Sedgwick-Sand Draws Watershed Conservancy District
Contract Type
Loan
Water District
64
County
Sedgwick
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Works of Improvement <br /> <br />for structures SS-l and ss-4 which are on State land. Improvements that <br />will have to be altered or relocated at the structure sites are windmills <br />on sites SS-2, 3, 5, 7 and 8, and a county road on site SS-3. <br /> <br />Floodway Structures <br /> <br />The three floodways included in the structural measures ~re Floodways I <br />and 2 connecting the Highline Canal to the South Platte River, and the <br />Ovid Floodway extending from Highway 138 around the southwest side of <br />/ Ovid, Colorado to the South Platte River. <br /> <br />Floodway I follows an existing floodway and irrigation drop ditch be- <br />tween the Highline Canal and Petersen Ditch. A new and/or enlarged <br />floodway outlet from the Petersen Ditch to the South Platte River wi 11 <br />be requi red. Floodway,2 is new and will util ize the borrow ditch along <br />county and state roads where possible. <br /> <br />Floodways use existing railroad and state highway bridges. Three new <br />county road 'bridges, seven farm bridges and one Ovid street bridge will <br />be rec;u ired. The Town Counct.l of Ov i d wi 11 move or relocate ci ty ut i 1 it i es <br />as required for construction of the Ovid Floodway. <br /> <br />All floodways will have maintenance roadways built on one side wherever <br />they are not adJacent to an existing road. Floodway I crosses the <br />'---Sedgwtck-8<rr-St<lTe\itHdllfe ,A rea-ana- wi11-nave a ma I n tenance roao on t he <br />west side and a grouted road crossing on the riprap at the lower end of <br />the floodway. <br /> <br />Design Capacity <br /> <br />Floodways I and 2 <br /> <br />The Highline Canal intercepts floodwater, runoff from the area <br />above it. During maJor storm activity, irrigation flows will <br />be shutoff at the outlet from the Julesburg Reservoir to vacate <br />canal capacity and make it possible to handle flood inflows. <br /> <br />Floodways I and 2 have been provided to convey excess floodwater, <br />to the South Platte River. The floodways are located at points <br />along the canal where the sum of the maximum low stage principal <br />spill~ay flows from a group of the dams reach the safe capacity of <br />the canal. This resulted in Floodway I handling the discharge from <br />five of the floodwater retarding structures and Floodway 2 handling <br />the discharge from four of the floodwater retarding structures. <br />Structure SS-8.5 is contained by the Highline Canal. <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.