My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00435
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153399
Contractor Name
Sedgwick-Sand Draws Watershed Conservancy District
Contract Type
Loan
Water District
64
County
Sedgwick
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Sponsor i ng <br />Local <br />Organization <br />(percent) <br /> <br />Service <br />(pe rcen t) <br /> <br />Estimated <br />Relocation <br />Payment Costs <br />(do 11 ars) <br /> <br />Relocation Payments <br /> <br />27.0 <br /> <br />73.0 <br /> <br />$0 1/ <br /> <br />3. The Sponsoring Local Organizations will acquire or provide <br />assurance that landowners or water users have acquired such <br />water rights pursuant.to State law as may be needed in the <br />installation and operation of the works of improvement. <br /> <br />4. The percentages of construction costs of structural measures <br />to be paid by the Sponsoring Local Organizations and by.the <br />Service are as follows: <br /> <br />Works of <br />Improvement <br /> <br />Sponsoring <br />Local <br />or~anizations <br />percent) <br /> <br />Service <br />(percent) <br /> <br />Estimated <br />Construction Costs <br />(dollars) <br /> <br />Floodwater Retarding <br />Structures SS-l, .SS-2, <br />SS-3, sS-4" S5-4.5. SS-5, <br />SS-6, SS~7, S5-8, .SS~8.5 <br />Grade Stabilization <br />$,t-r-u_es CS 2. 1 , <br />GS-2.2 and GS~6. <br />Canal Inlets <br />(10 dr~ps) <br />Floodway Improvement: <br />Floodways 1, 2, and <br />Ovid Floodway <br /> <br />0.0 <br /> <br />100.0 <br /> <br />$2,422,000 <br /> <br />1/ <br /> <br />. . ., <br />Investigation has disclosed that under present conditions, the <br />project measures will not result in the displacement of. any <br />person, business, or farm operat.ion. However,,if relocations. <br />become. necessary, relocation payments ,wi 11 be cost-shared in <br />accordance with the percentages shown. <br /> <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.