Laserfiche WebLink
<br />, <br /> <br />a <br /> <br />. <br /> <br />, <br /> <br />B. Project Schedule <br /> <br />We would propose that the project start immediately, Approximate time to <br />complete the project would be six to eight weeks. ~ (This should meet the <br />July 15, 1980 deadline if we can start before the end of May) However, <br />if the Ditch Boards would need the study completed at an earlier date, we <br />will be more than happy to work with the Board to meet an earlier deadline <br />if necessary, <br /> <br />C, Summary <br /> <br />In the preceeding presentation we have hopefully established a program <br />which will meet and exceed the Di~ch Board's initial requirements. We <br />feel that our firm is more than capable of providing the proposed services <br />in a competent and professional manner, and within the time frame presented, <br /> <br />In the remaining sections of this proposal, the qualifications of our <br />firm and the resumes of the personnel who will be directly involved with <br />the project are presented. <br /> <br />Mr, Robert H, Schemmerling has be~n designated Project Engineer for this <br />project. <br /> <br />" <br />