My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00433
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153158
Contractor Name
Dove Creek, Town of
Contract Type
Grant
Water District
0
County
Dolores
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, ,. <br /> <br />, <br /> <br />SECTION, V <br /> <br />SECTION VI <br /> <br />,~ <br />. \,-" <br />.,,) <br /> <br />~...-.. <br />.' j" ~ <br />'I.;."-~' <br /> <br />PURCHASE AND,TRANSMISSION OF WATER <br /> <br />A, Potential Arrangements and Water Costs. <br /> t <br />B, Pro spec ts of Obtaining Future Water Supplies <br />C, Possible Benefi ts <br /> <br />D.' Possible Disadvantages <br /> <br />E. Average Unit Cost <br />The estimated average cost per 1,000 gallons <br />of treated water delivered, <br /> <br />PROJECT EVALUATION, <br /> <br />A, Cost Estimates of Proposed New Construction <br /> <br />B. Summary of Estimated Project Costs <br />The total estimated project cost and average <br />cost per 1,000 gallons of treated water produced <br />for each alternative will be compared, Other <br />aspects of each alternative will be discussed, <br /> <br />C. Annual Payment Capacity <br />A financing schedule will be presented to determine <br />the payment capacity for each alternative. <br /> <br />SECTION VII FINANCIAL PROGRAM <br /> <br />A, Financial Feasibility <br />The financial feasibility of each alternative <br />will be demonstrated. A payout schedule for <br />each year of the repayment period will be prepared, <br />An emergency operating reserve shall be accumulated <br />over the first 10 years of the repa)~ent period. <br /> <br />SECTION VIII SUMMARY AND RECOMMENDATIONS <br /> <br />A, General <br />The significant aspects of our investigations <br />on the existing. sources, existing facilities, <br />water production, water use, and future system <br />requirements will be reviewed, <br />
The URL can be used to link to this page
Your browser does not support the video tag.