Laserfiche WebLink
<br />, ,. <br /> <br />, <br /> <br />SECTION, V <br /> <br />SECTION VI <br /> <br />,~ <br />. \,-" <br />.,,) <br /> <br />~...-.. <br />.' j" ~ <br />'I.;."-~' <br /> <br />PURCHASE AND,TRANSMISSION OF WATER <br /> <br />A, Potential Arrangements and Water Costs. <br /> t <br />B, Pro spec ts of Obtaining Future Water Supplies <br />C, Possible Benefi ts <br /> <br />D.' Possible Disadvantages <br /> <br />E. Average Unit Cost <br />The estimated average cost per 1,000 gallons <br />of treated water delivered, <br /> <br />PROJECT EVALUATION, <br /> <br />A, Cost Estimates of Proposed New Construction <br /> <br />B. Summary of Estimated Project Costs <br />The total estimated project cost and average <br />cost per 1,000 gallons of treated water produced <br />for each alternative will be compared, Other <br />aspects of each alternative will be discussed, <br /> <br />C. Annual Payment Capacity <br />A financing schedule will be presented to determine <br />the payment capacity for each alternative. <br /> <br />SECTION VII FINANCIAL PROGRAM <br /> <br />A, Financial Feasibility <br />The financial feasibility of each alternative <br />will be demonstrated. A payout schedule for <br />each year of the repayment period will be prepared, <br />An emergency operating reserve shall be accumulated <br />over the first 10 years of the repa)~ent period. <br /> <br />SECTION VIII SUMMARY AND RECOMMENDATIONS <br /> <br />A, General <br />The significant aspects of our investigations <br />on the existing. sources, existing facilities, <br />water production, water use, and future system <br />requirements will be reviewed, <br />