Laserfiche WebLink
<br />Form 6-AC-02A <br /> <br />roi' tTMENT OR AGENCY NUMUER <br />34-04-00 <br />('ONTRACT ROUTING NUMllL-:Jl <br />'593 <br />$9,775 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, m;J.de this l'lrh day of Alle:tl~r 197&, by and between the <br />State of Colorado for the use and benefit of tile Department of ., N::thtral Rp'f;Ol1rCp.~ <br />(r.nl n,...qnn W:::.h:"", r.nn!,:pnr.qri 011 RORrd) <br />hereinafter referred to as the State, and '2 ..Int:p.rnati onal El1~; neg5;~~ c.oII\PRnY r Tnc. t <br />1777 So. Bellaire Street, Denver, Colora 0 <br />hereinafter referred to as the contractor, <br /> <br />WIIEREAS, authority exists in the law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains aYailable for payment in Fund Ntlmber400R , <br />G/L Account Number 1)2'57, Contract Encumbrance NumberC:l 'l~~O1-; and <br /> <br />WHEREAS, required l1pproval, clearance and coordination has been tlccomplished from and with appropriate <br />agencies; and ' <br /> <br />WHEREAS, "pursuant to the provisions of 37-60-121(2), CRS 1973, as <br />amended, the Colorado Water Conservation Board may allocate to any <br />project to be constructed by it, such amounts as may be determined by <br />it for investigating such project, in addition to the amount allocated <br />for a feasibility study; and <br /> <br />WHEREAS, the Board proposes to construct the Yamcolo project, <br />which project has already been designed by Western Engineers, a <br />Colorado engineeriog company; and <br /> <br />WHEREAS, the aoard desires to conduct a geological, design and <br />engineering feasibility review of said project; and <br /> <br />WHEREAS, the Contractor is a professional engineering firm with <br />specific experience in this field of multipurpose water projects; and <br /> <br />WHEREAS, the Contractor is an independent contractor and as such <br />is not entitled to any benefits of the State personnel system; <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. That in consideration of the paymentS to be made to the <br />Contractor by the State as hereinafter set forth, the Contractor agrees <br />to perform the following services for the State: <br /> <br />a. Perform a three phase geologic and engineering review of <br />the Yamcolo project as detailed in Appendix A. <br /> <br />b. Complete the review and prepare a written report thereof <br />to the State ~ithin thirty (30) days of the date of this contract, <br />to wit, not later than September 15, 197B. <br /> <br />c. Maintain liaison with the State through the Colorado Water <br />Conservation Board and with the proper officials of the Upper <br />Yampa Water Conservancy District as the review progresses. <br /> <br />2. As compensation for the services of the Contractor, the State <br />agrees to pay to the Contractor a sum not to exceed Nine Thousand <br />Seven Hundred Seventy-Five Dollars ($9,775), based upon the cost <br />schedule set forth in the Contractor's proposal dated July 12, 1978, <br />which proposal and the cost schedule included therein is incorporated <br />herein and made a part of this contract by attachment as Appendix A. <br />Said ,sum of Nine Thousand Seven Hundred Seventy-Five Dollars ($9,775), <br />or such part thereof as may be actually earned by the Contractor in <br />accordance with the schedule attached hereto as Appendix A, shall be <br />paid to the Contractor in a lump sum upon the completion and acceptance <br /> <br />Page I of L pages <br />.(500 instructions on reverse of last page.) <br />